Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 10, 2025 at 8:00 PM
Updated April 5, 2025
Renovation of an educational facility in Monroe, North Carolina. Completed plans call for the renovation of a educational facility.
Monroe Middle School Bathroom Renovation . Location: 601 E Sunset Dr. Monroe NC 28112. Question Deadline 03/28/2025 at 2:00 PM ET All questions relating to this project shall be directed to the Procurement Lead in the form of an email Jennifer West UCPS Purchasing Department facilitiesbids@ucps.k12.nc.us. Answers will be provided to all bidders in the form of an addendum by 2:00 PM, March 31, 2025. UCPS reserves the right to award this project in a method considered to be most advantageous. This includes the right to issue single award, multiple awards, or reject all bids. UCPS is not required to award a contract. Cafeteria Bathroom Boys o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Cafeteria Bathroom Girls o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Girls 800 Hall o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. 3 o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Boys 800 hall o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Girls 810 A o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Boys 810 B o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Girls 700 o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. 4 o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Boys 700 o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Girls 600 o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Boys 600 o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. 5 o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Boys 600 D o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls. Girls 600D o Ceiling Replacement: Remove the existing suspended ceiling system and install a new hard ceiling that meets all applicable local and state building codes. o Fixture Integration: Ensure all existing fixtures within the current ceiling system are properly incorporated into the new hard ceiling. o Finishing & Compliance: The new ceiling shall be fully finished to a high standard, adhering to all regulatory requirements. o Painting: Apply a durable white paint finish to the completed ceiling for a clean and uniform appearance. o Painting: Apply durable paint to match finished walls.
Post-Bid
Educational
$565,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 5, 2025
601 E Sunset Dr, Monroe, NC
Related To This Project
Monroe, NC
Bid Date: Mar 18 2025
Monroe, NC
Bid Date: Apr 22 2025
Monroe, NC
Bid Date: Apr 02 2025
Monroe, NC
--
Monroe, NC
Bid Date: Apr 24 2025
Monroe, NC
Bid Date: Jun 03 2025
Monroe, NC
Bid Date: Apr 10 2025
Monroe, NC
Bid Date: Mar 18 2025
Monroe, NC
Bid Date: Feb 28 2025
Monroe, NC
Bid Date: Mar 27 2025
Monroe, NC
--
Monroe, NC
Bid Date: Mar 19 2025
Monroe, NC
Bid Date: Feb 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
