Site work for a water / sewer project in Fayetteville, North Carolina. Completed plans call for site work for a water / sewer project.

Potential subcontracting opportunities include but are not limited to surveying, clearing and grubbing, hauling, asphalt paving, striping, traffic control, erosion control, seeding, linework, flatwork, and fencing. All quotations will be accepted up to the closing time of the bid date. Please advise if assistance is needed with obtaining necessary equipment, supplies, materials, or insurance/bonding to satisfy the work requirements. We are willing to accept quotations for all or partial quantities and items of work. We can offer 2-party check payments and quick payment agreements, but the agreements need to be negotiated prior to the bid date. This item is covered in line item A-17 15 RCP (in roadway) & Bedding Stone. 22LF of pipe to be installed between proposed CB-5/CB-6 and 18LF between existing CB-3/CB4. The removal of 163LF of 15 RCP is incidental to the installation of 167LF of 18 HDPE due to it being in the same location and trench. Use onsite material for the back fill. If found to be unsuitable the City is adding Line Item A-28 Select Borrow 80 CY. The bedding stone and backfill requirements are the same as shown in the City of Fayetteville s Standard Details DR-1. Doubled walled HDPE pipe is required. The Owner is responsible for initial testing. The Contractor is responsible for any additional testing resulting from failed test. A maintenance bond is not required on this project. Section 02931 Sod paragraph 1.05.B.3 is not applicable in this contract. Paragraph 1.06.D does apply in this contract. The type Temporary Pet Protection Fencing will be 4 foot chain link fencing ground mounted stable enough to contain the pet. The contractor will follow the City of Fayetteville s Standard Detail SD-11.1. The width and depths will be determined in the field and paid accordingly. There are no Milestones in this contract The removal of 163LF of 15 RCP is incidental to the installation of 167LF of 18 HDPE due to it being in the same location and trench. The City has the invert data on the existing sanitary sewer and verified that there is no conflict with the storm drainage. Temporary driveways and maintaining access is incidental to construction. The limits of driveway removal will be determined in the field and paid according to applicable unit prices.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

6

15

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Gratings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Milling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
94
Bidding Soon
1,402
All Active Projects
637
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

April 16, 2025

img_map_placeholder

Murray Fork Dr, Fayetteville, NC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Murray Fork Road Drainage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.