Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a 10,000-square-foot educational facility.

Interior Renovation Question Deadline 03/13/2025 All questions/requests must be received in writing by COB . Email questions to PM Chinmay Sawalkar (cpsawalkar@cps.edu) and CC Adam Pinter (aapinter@cps.edu). An addendum, if required will be issued by COB 3/14/25 1. Patch and Paint walls and ceilings (app. area 10,000 SF) in the following rooms: Walls - Library; Vestibules by Entry Doors 1 and 2 Ceilings - Classrooms 215, 217, 111, 112, 308; near Entry doors 1, 2, 5 and 8. Scrape and/or patch walls and ceilings where applicable in these areas. Painting work must be performed by RRP certified abatement contractor. Note: Do not paint any walls made of special materials, other than block wall or drywall. 2. Repair/patch plaster ceiling in Classrooms 111 and 112. One spot each room. App. 10 SF total. This work must be performed prior to painting the ceilings in these two rooms. 3. Abate and replace existing floor carpet in the Library (Rooms 209, 210). New floor is carpet tiles per CPS standards. App. 1,500 SF area. Carpet tiles color to be selected by the Principal. Contractor to move furniture and books etc. out for this work, temporarily store it in the hallways and move these items back in after new carpet tiles are installed. Abatement work must be performed by licensed subcontractor under supervision of MEC TEM's personnel. Follow state laws and Environmental Design Manual for proper disposal of removed materials. 4. Strip existing paint and repaint stair railings and stringers at the Main (older) building. Refinish existing wood strips above the railing where present. Match the existing colors. Approx. quantity 700 LF. 5. Abate and replace existing floor tiles (VCT) at entry door 2 vestibule area. Approximate area 200 SF. VCT tiles color to be selected by the Principal. Abatement work must be performed by licensed subcontractor under supervision of MEC TEM's inspectors. Follow state laws and Environmental Design Manual for proper disposal of removed materials. Scope: ALTERNATES Alternate 1. - Abate and replace existing floor tiles (VCT) at Hallway floor extension near entry door 2 (from vestibule up to the newer building floor edge). Approximate area 200 SF. VCT tiles color to be the same as the one from Base Item 5 above. Alternate 2 - Patch and Paint Walls and ceilings similar to Base Item 1 above. Area - Main Building North corridor at 3 rd floor. Approximate area 1,500 SF. Construction is required to be completed during the CPS Summer break 2025. The earliest start date is 6/16/25. Expected construction duration is 7 weeks. The required Preliminary Acceptance date is 8/1/25. The Bass Elementary School is located southwest of Chicago downtown, off EB I-94. The base scope for project includes painting and floor replacement work inside the Main Building in areas listed here. Walls and ceilings in the classrooms and entry vestibules are included as shown on the next page. Small amount of patching work is required, prior to painting. Very small quantity of plaster patching is required in Rooms 111 and 112. Environmentally hazardous carpet in the Library needs to be abated and replaced by carpet tiles. VCT tiles in the entry #2 vestibule also need to be abated and replaced. Railings and stringers of the Stairs in the Main (older) Building need to be stripped and painted. Include refinishing the wood strips atop the railings, if applicable. There are 2 alternates to be included in the work scope as shown. First item includes VCT abatement and replacement in the area extending from Door 2 vestibule to the newer building joint. Second alternate includes patching and painting in the Main Building 3 rd floor North corridor. Refer to Environmental Reports and Design Manual by TEM Inc. for abatement work to be performed by licensed subcontractor. Painting will be performed by RRP certified vendor.

Post-Bid

Educational

$1,500,000.00

Public - City

Renovation

4

13

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Mockups, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
169
Bidding Soon
2,131
All Active Projects
1,070
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

June 16, 2025

img_map_placeholder

1140 W 66th St, Chicago, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bass Es - Interior Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.