BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2025 at 8:00 PM

Updated April 2, 2025

Site work and paving for a mixed-use development in Toronto, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

EllisDon is the Construction Manager for the Toronto Waterfront Revitalization Corporation (TWRC) Port Lands Flood Protection Project (PLFP). EllisDon invites eligible companies, firms or joint ventures to submit proposals for RFP#20.3 - Road Construction (Villiers Street, Munitions Street & New Cherry South Driveway): The work to be performed under this contract involves the tasks required to complete the proposed granular placement, concrete flatworks, asphalt paving, landscaping, line markings and traffic signage. The scope of work is summarized by the following: 1. Villiers Street West This work consists of granular placement, curb installation, asphalt placement, fencing and landscaping to construct a turnaround on Villers West. The contractor is to provide traffic control for all construction traffic ingress and egress. 2. SWTF Parking Lot This works consists of granular placement, asphalt placement and landscaping to construct a new Storm Water Treatment Facility (SWTF) parking lot. Prior to topsoil placement fence post installation for the perimeter fence must be installed. The contractor is to schedule their work to allow for bollard installation adjacent the housekeeping pads to be installed by others. The contractor is to provide traffic control for all construction traffic ingress and egress. 3. Villiers Street East Cul De Sac This work consists of full depth placement of granular A & B, curb installation and asphalt placement to construct a new cul-de-sac on Villers Street East. The contractor is to provide traffic control for all construction traffic ingress and egress. Villers Street Restoration This work consists of granular A placement, asphalt placement & landscaping. The contractor is to provide traffic control for all construction traffic ingress and egress. 4. Munitions Street This work consists of granular A base placement, asphalt placement, curb installation, sidewalk placement and landscaping. The contractor is to provide traffic control for all construction traffic ingress and egress. 5. Cherry Street South Driveway This work consists of replacement of the existing curb, asphalt cycle path and asphalt driveway. The contractor is to provide traffic control for all construction traffic ingress and egress including diverting pedestrians and cyclists to the West sidewalk at the Polson Street intersection. The contractor will have full access to the driveway and construction traffic will be diverted to the Future Polson entrance as shown on the drawings. Once the contractor has started work, the work must proceed without delay until all the work is complete. Interested parties shall submit their interest to the following address in order to receive the RFP documentation. Email to: Birat Upreti (bupreti@ellisdon.com) Subject: RFP 20.3 - Road Construction - "name of your company". EllisDon reserves the right to cancel, waive or combine with alternate packages all or part of the scope, or to re-advertise this solicitation with either an identical or revised scope at any time. Question Acceptance Deadline: 2025/04/01 12:00:00 AM EDT

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
197
Bidding Soon
4,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

Project location map

312 Cherry St, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.