BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work for a road / highway in Palmer, Alaska. Completed plans call for site work for a road / highway.

Ref. #: 25-144B The Matanuska-Susitna Borough is requesting bids from qualified contractors to supply and install a new chain link fence around the new landfill entrance and road, along the western and southern perimeters. Question Deadline 03/19/2025 at 5:00 PM AKT Questions through Online Portal SCOPE OF WORK Phase I New Gates and Fencing for road 1. New fencing will be installed starting at the existing fence post located on the southwest corner of the Animal Control parcel west to the toe of the road and then parallel the road and stop at the caul-de-sac at the entrance approximately 2,560 feet all within the Landfill shown on the map as per Attachment #1. The fence fabric shall be six (6) feet in height 9 gauge with three strands of barbed wire as per the Chain Link Fence and Gates Specification. Attachment #2. 2. There will be two (2) gates installed to access the CLF 3. Gate 1 shall be a 15-foot double swing, complete with latches and three (3) strands of barbwire. 4. Gate 2 shall be a 15-foot double swing, complete with latches and three (3) strands of barbwire. 5.This scope must be completed by 6/30/25. Phase II New Gates and Fencing for Entrance 1. New fencing will be installed continuing from the caul-de-sac and extend around the perimeter of the entrance area to a post approximately 3,830 feet all within the Landfill shown on the map as per Attachment #3. The fence fabric shall be six (6) feet in height 9 gauge with three strands of barbed wire as per the Chain Link Fences and Gate Specifications. Attachment #2. 2. There will be two (2) gates installed to access the CLF. 3. Gate one (1) shall be a 15-foot double swing, complete with latches and three (3) strands of barbwire. 4. Gate two (2) shall be installed approximately 20 feet from the caul-de-sac, not to impede the entrance to the scale. 5. Gate two shall be a Structural Cantilever Slide Gate as manufactured by Tymetal Corp. or an approved equal. See Attachment #4. 6. An Automatic switch will be used to operate the gate; this will be used to operate the gate during operating hours, opening the gate at 8:00 AM and closing the gate at 5:00 PM. There will be an exit loop to open the gate upon departure from the landfill after hours 7. The gate will also come with 30 handheld openers. 8.This Scope must be Completed by 10/30/2025.

Award

Roads / Highways

$169,596.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
4
Bidding Soon
148
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

1201 N 49th State St, Palmer, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.