Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2025 at 8:00 PM
Updated March 18, 2025
This is a service / maintenance or supply contract in Oklahoma City, Oklahoma. Contact the soliciting agency for additional information.
Performance Work Statement (PWS) Department of Veterans Affairs (VA) Veterans Health Administration (VHA) Chiller #1 Vane Motor Replacement (Brief Scope of Work) A PURPOSE Veterans Affairs has a requirement for Chiller #1 Vane Motor Replacement services at the Oklahoma City VA Health Care System (OKCVAHCS). Services are to be performed in accordance with this PWS and to OEM standards, with the intent of ensuring the equipment operates as the original manufacturer intended, uninterrupted (95% uptime), in a cost-effective, efficient manner, contributing to the VA Mission. This is a non-personal services contract. The Contractor, its employees, agents and subcontractors shall not be considered VA employees for any purpose of fulfilling the SOW and shall be considered employees of the Contractor. C&A requirements do not apply, and a Security Accreditation Package is not required. LOCATION: Oklahoma City VA Health Care System (OKC VAHCS) 921 NE 13th St. Oklahoma City, OK 73104 A TASKS AND REQUIREMENTS: This project is to remove the vane motor from the chiller replace and calibrate vanes. Check oil in the sump and fill to manufacture specs. Start the chiller and check the operation. The contractor is fully responsible for verifying and validating all information contained within this statement of work. The contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site. All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances. All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified. The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA HCS. VA facilities are tobacco-free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor s compliance with this policy. All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards. The contractor shall provide supervision, manpower, and materials to remove the existing vane motor check sump oil levels and start the chiller and chiller operation. Contractor shall remove the vane motor replace the motor and re-calibrate. Contractor shall check the sump oil level and fill per manufacturer specs. Contractor shall start chiller and check operation. Contractor shall dispose of any trash or debris they generate during the duration of the performance period and completion of the project. Clean up the area after project completion and contact COR for final inspection. Performance Period: 30 days IMPORTANT NOTE: This Sources Sought is for information only (to determine the socioeconomic status of interested companies). No award will be made off of this posting. LIMITATIONS OF SUBCONTRACTING: The Limitations of Subcontracting may or may not apply to a resulting solicitation from this Market Research. Vendors are advised to familiarize themselves with Federal Acquisition Regulation parts 19.505(a)(2) and 19.505(b)(1) as it pertains to subcontracting limitations. Vendors are also advised to familiarize themselves with 13 CFR 125.6 and the penalties described in this regulation. Please communicate via e-mail to tiffani.perkins@va.gov by COB 3/14/2025 as to your company s interest and ability to perform service per this brief Scope of Work. If interested, please provide the following: Please state your company s business size as related to NAICS code 238220 As per the Limitations of Subcontracting: (see FAR 19.505) As Primary Contractor: what % of Total Contract Value will you retain If using a Subcontractor: what % of Total Contract Value will go to them Please provide SAMs Unique Entity Identifier number If you have an FSS/GSA contract that includes this service Provide FSS/GSA contract number if applicable A In order for you company s information to be counted in relation to this Market Research all above questions must be answered. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Medical
Public - Federal
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 16, 2026
921 NE 13th St, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Apr 29 2025
Oklahoma City, OK
Bid Date: Apr 17 2025
Oklahoma City, OK
--
Waterline Replacement 1501 West I-240 Service Road 15515 Red Coach Road 130 NW 19th Street - 5720345
Oklahoma City, OK
Bid Date: Apr 02 2025
Oklahoma City, OK
Bid Date: Jan 15 2026
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Apr 03 2025
Oklahoma City, OK
Bid Date: Apr 02 2025
Oklahoma City, OK
Bid Date: Apr 02 2025
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Apr 08 2025
Oklahoma City, OK
Bid Date: Mar 14 2025
Oklahoma City, OK
Bid Date: May 29 2025
Oklahoma City, OK
Bid Date: Apr 01 2025
Oklahoma City, OK
Bid Date: Jun 03 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
