BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Renovation of an educational facility in Oakland, California. Completed plans call for the renovation of a educational facility.

The Owner reserves the right to add or deduct any of the additive or deductive items after the lowest responsible and responsive bidder is determined. The lowest bid shall be determined on the amount of the base bid. Engineer's Estimate: $300,000.00 Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have an C-39 -Roofing Contractor's license at the time of award and shall maintain that license in good standing through Completion of the Contract and all applicable warranty periods. For all projects over Twenty-Five Thousand Dollars ($25,000), the bidder shall state the public works contractor registration number on the Designation of Subcontractors form for each subcontractor performing more than one-half of one percent (0.5%) of the bidder's total bid. The Contract Time shall be sixty (60) calendar days, and liquidated damages for delay shall accrue. Remove existing roof system and replace with like-for-like composite. Install Dens Deck insulation and 2-ply torch-down roofing. Replace drains, heater bases, pipe flashings, gutters, and cap. Install building code-compliant roof anchors. Replace metal panels and louvers like-forlike. Install exterior roof access. Add 10 low-profile vents on composite sections. Contractor is responsible for removing, re installing and raising RTU's. Contractor is responsible for adjusting ductwork. Contractor is responsible for adjusting gas and electrical connections to the RTU's. Contractor is responsible for raising ductwork if deemed necessary. Contractor will perform water testing of roof before construction and after with an OUSD PM and/or PE present. Contractor is to provide 2-year contractor warranty and 30-year NDL manufacturer's warranty. Contractors must adhere to all safety, OUSD standards and project requirements.

Award

Educational

$196,750.00

Public - City

Renovation

3

10

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
253
Bidding Soon
3,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.