EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2025 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in San Francisco, California. Contact the soliciting agency for additional information.

This Project is subject to compliance monitoring and enforcement of prevailing wage requirements by the California Department of Industrial Relations ("DIR") and the San Francisco Office of Labor Standards Enforcement. No contractor or subcontractor may be listed in a bid for a public works project and no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR per California Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under California Labor Code Section 1771.1(a)]. The objective of the project is to provide contingency-based as-needed replacement of sections of existing sewer pipelines on short notice at locations to be determined within the City and County of San Francisco. The work is to be performed in San Francisco, California. The Engineer's Estimate is $10,600,000.00. The City may award the contract to the responsible Bidder that submits the lowest responsive Bid. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of Attachment 1. The Local Business Enterprise (LBE) subcontracting requirement is 8.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs. The project involves specialty work scopes, including but not limited to lining side sewer with UV Cured Liner and 12-inch, 15-inch, and 18-inch diameter main sewers with cured-in-place pipe liner (CIPP) and installation of HDPE for side sewers and main sewer by trenchless pipe-bursting installation method. This contract scope of work is almost identical to WW-760, which also had an established LBE requirement of 8%. PUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jason Chow at (415) 554-0631 or Jason.Chow@sfgov.org for further information about the LBE requirements. Subcontracting opportunities may include, but not limited, to the following major types of work: sawcutting, traffic control and concrete. In addition, the SFPUC seeks to promote diversity within its contracting opportunities. Thus, the SFPUC strongly encourages bids from Bidders that optimize the use of S.F. Small and Micro-LBE certified subcontracting firms. A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. In accordance with San Francisco Administrative Code Chapter 6, the City and County of San Francisco will not accept any offer/bid or award any contract in excess of $1,170,000 until such time as (a) the General Manager of the San Francisco Public Utilities Commission recommends the contract for award and (b) the San Francisco Public Utilities Commission then adopts a resolution awarding the contract. Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds. Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 of the City's Labor and Employment Code within two weeks after notification of award by the SFPUC General Manager. This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction ("Policy") as set forth in Section 6.22(g) and Chapter 82 of the Administrative Code. Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Contract Section 00 73 30 for more information. If a Bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the Bidder shall, no later than the 10th working day prior to the date of Bid opening, provide written notice to the Manager, Contract Administration Bureau, setting forth with specificity the grounds for the objection.

Sub-Bidding

Water / Sewer

$10,600,000.00

Public - City

Service, Maintenance and Supply

4

16

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Parking Areas, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Cold Milling Asphalt Paving, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
113
Bidding Soon
1,909
All Active Projects
925
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 2, 2025

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

As-Needed Spot Sewer Replacement No. 47

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.