BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Demolition, site work, new construction, renovation and addition to a fire / police facility in Ashtabula, Ohio. Working plans call for the addition of a 2,950-square-foot, one-story above grade fire / police facility; for the demolition of a fire / police facility; for the construction of a fire / police facility; for the renovation of a 4,730-square-foot fire / police facility; and for site work for a fire / police facility.

As of 11/21/2025 All bids came in over budget. Therefore no contract was awarded. The township will rebid the project soon. Plymouth Township Fire Station Invites Sealed Bids From Prospective Contractors for the 2,950 Sf Addition and Renovation to an Existing One-story, 4,730 Sf Fire Station. Located at 1001 Plymouth Road, Ashtabula, Ohio 44004. Q/A :- All Bids Shall Be Based on the Products and Systems Specified. Questions and Requests for Substitutions Shall Be Submitted in Writing to the Architects Office Not Later Than 5:00 P.m., Tuesday, October 21, 2025. Direct Questions to Ahmad Thomas via Email Athomas@tcarchitects.com. Plymouth Township Fire Station Reserves the Right to Cancel Any Solicitation and to Accept or Reject in Whole or in Part Any Bid for Good Cause When It is in the Best Interest of Them. A. The Work of Project is defined by the Contract Documents and consists of the following: 1. A 2,950 SF addition housing four (4) bunk rooms, two (2) offices, living quarters, exercise, laundry, and storage rooms, along with accessory spaces to an existing 4,730 SF fire station for fire vehicles and storage. The station houses four (4) full time fire persons. This slab-ongrade building is not sprinklered. B. Contracting Method: The contractor is responsible for all aspects of the Work described in the Contract Documents. C. The Owner is a non-profit organization and may have some labor or materials donated. These materials will be Owner-Provided and Contractor Installed. Completion- 280 Calendar Days Bid(10%), Performance(100%), Payment(100%)

Final Planning

Fire / Police

$1,575,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

62

21

17

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
110
Bidding Soon
1,721
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2025

January 15, 2026

Project location map

1001 Plymouth Brick Rd W, Ashtabula, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.