BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated May 8, 2025

Site work for a road / highway in South Lake Tahoe, California. Completed plans call for site work for a road / highway.

The Work to be done is shown on the Plans, and generally consists of, but is not limited to: The construction of erosion control / water quality improvements including a rockery wall. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. Location Details Site Address: Oflyng Drive City: South Lake Tahoe County: El Dorado County State/Province: CA Site Directions: The project site is located on Oflyng Drive, between Southern Pines Drive and Coto Street. The site can be reached by heading east on Pioneer Trail from SR89/US50, north on to Southern Pines Drive and then east on to Oflyng Drive. Doc Notes: The digital Contract Documents, including the Project Plans, may be downloaded for $42.00 by inputting the online. Please contact onlinefor assistance in free membership, registration, downloading, and working with this digital project information. To be included on the list, receive notification of addenda, and to be eligible to bid interested parties must download the Contract Documents, including the Project Plans, from online. Those downloading the Contract Documents, including the Project Plans, assume responsibility and risk for completeness of the downloaded Contract Documents. The Contract Documents, including the Project Plans, may be examined in person at the Department of Transportation's office at 924B Emerald Bay Road, South Lake Tahoe, CA. However, the Department of Transportation will no longer sell paper copies of the Contract Documents. Interested parties may also access the website by clicking on the link next to the Project Name or entering the Project # on the Department of Transportation's website at online.

Bid Results

Roads / Highways

$203,723.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
90
Bidding Soon
720
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 24, 2025

Project location map

Oflyng Dr, South Lake Tahoe, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.