Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2025 at 8:00 PM
Updated May 8, 2025
Site work for a road / highway in South Lake Tahoe, California. Completed plans call for site work for a road / highway.
The Work to be done is shown on the Plans, and generally consists of, but is not limited to: The construction of erosion control / water quality improvements including a rockery wall. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. Location Details Site Address: Oflyng Drive City: South Lake Tahoe County: El Dorado County State/Province: CA Site Directions: The project site is located on Oflyng Drive, between Southern Pines Drive and Coto Street. The site can be reached by heading east on Pioneer Trail from SR89/US50, north on to Southern Pines Drive and then east on to Oflyng Drive. Doc Notes: The digital Contract Documents, including the Project Plans, may be downloaded for $42.00 by inputting the online. Please contact onlinefor assistance in free membership, registration, downloading, and working with this digital project information. To be included on the list, receive notification of addenda, and to be eligible to bid interested parties must download the Contract Documents, including the Project Plans, from online. Those downloading the Contract Documents, including the Project Plans, assume responsibility and risk for completeness of the downloaded Contract Documents. The Contract Documents, including the Project Plans, may be examined in person at the Department of Transportation's office at 924B Emerald Bay Road, South Lake Tahoe, CA. However, the Department of Transportation will no longer sell paper copies of the Contract Documents. Interested parties may also access the website by clicking on the link next to the Project Name or entering the Project # on the Department of Transportation's website at online.
Bid Results
Roads / Highways
$203,723.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2025
April 24, 2025
Oflyng Dr, South Lake Tahoe, CA
Related To This Project
South Lake Tahoe, CA
Bid Date: May 15 2025
South Lake Tahoe, CA
Bid Date: Mar 19 2025
South Lake Tahoe, CA
Bid Date: Mar 28 2025
South Lake Tahoe, CA
Bid Date: May 08 2025
South Lake Tahoe, CA
Bid Date: Apr 22 2025
South Lake Tahoe, CA
--
South Lake Tahoe, CA
Bid Date: May 07 2025
South Lake Tahoe, CA
Bid Date: Jun 26 2025
South Lake Tahoe, CA
Bid Date: Sep 24 2025
South Lake Tahoe, CA
Bid Date: Mar 21 2025
South Lake Tahoe, CA
Bid Date: Apr 08 2025
South Lake Tahoe, CA
Bid Date: Mar 18 2025
South Lake Tahoe, CA
Bid Date: Mar 18 2025
South Lake Tahoe, CA
--
South Lake Tahoe, CA
Bid Date: Feb 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
