EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a parking garage in Morrisville, North Carolina. Completed plans call for the renovation of a parking garage.

Parking Garage Rehab - Phase 3 PG3 and PG4 Restoration - Fire Alarm Replacement. All Contractors are hereby notified that they must comply with any and all Federal or State Contractor Licensing Requirements including any requirements applicable for furnishing and installing the work depicted in bid documents. General Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina will be observed in receiving and awarding general contracts. Question Deadline 03/28/2025 at 4:00 PM ET All questions concerning the Plans and Specifications during the bidding period must be emailed to the attention of France Campbell, Director of Landside Engineering at france.campbell@rdu.com. Please insert "Question(s) - PG3/PG4 Fire Alarm IFB" as the subject for the email Each bid shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to but not less than 5% of the proposal or a bid bond of 5% of the bid executed as set forth in the Instruction to Bidders by a surety company licensed under the laws of North Carolina to execute such bonds. The deposits shall be made payable to the Owner and shall be retained by the Owner as liquidated damages in the event the successful bidder fails to properly execute the contract within ten (10) days after the award and to give satisfactory surety as required by law. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract Sum. The MWSB Goals for MWSB participation on this contract represent the total dollars that will be spent with MWSBs as a percentage of the total contract amount, including any change orders and contingency. In accordance with the MWSB Program, the Authority will require that the selected firm must either meet the MWSB goals or demonstrate that the bidder has made sufficient good faith efforts to meet the MWSB goals. The MWSB goals are as follows: Minority-owned businesses - 3% Woman-owned small businesses - 3% The Owner reserves the right to retain all bids for a period of 90 days after the scheduled closing time for receipt of bids. No bid may be withdrawn by a bidder within 90 days after the scheduled closing time for receipt of bids. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities. The Authority reserves the right to revise the schedule in its sole discretion.

Sub-Bidding

Parking Garage

$300,000.00

Public - City

Renovation

38

15

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
35
Bidding Soon
1,092
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

img_map_placeholder

1000 Trade Dr, Morrisville, NC

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Parking Garage Rehab - Phase 3 PG3 and PG4 Restoration - Fire Alarm Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.