BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 15, 2025

Site work and paving for a sidewalk / parking lot in El Granada, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 04/10/2025 at 5:00 PM PT Requests for modifications, questions or clarifications of any requirement must be submitted in writing by email to: jmoren@smharbor.com, or by U.S. Mail to U.S. Postal Service address The San Mateo County Harbor District is requesting proposals from qualified design, engineering firms or individuals (Proposer) to provide professional design, engineering, technical specifications, permitting and construction support services for the Burnham Strip Overflow Parking Lot Project. Proposer must be licensed by the State of California to undertake the type of design work required by the Project (engineer's/architect's certificate number must be included in proposal) Proposals will be examined by District Staff and reported to the San Mateo County Harbor District Board of Harbor Commissioners within one hundred twenty (120) calendar days after the proposals have been opened. The District reserves the right to reject any and all proposals; or to waive any irregularities or informalities in any proposal or in the proposal procedure; or to postpone the proposal opening for good cause. No Proposer may withdraw its proposal for a period of one hundred twenty (120) calendar days after the date of opening of the proposals. Each Proposer will be notified of award of contract, if an award is made. The San Mateo County Harbor District (District) requests proposals from qualified Proposers to provide design, engineering, public outreach, permitting and construction management services for the Burnham Strip Overflow Parking Lot Project, a project to improve recreational access to the San Mateo Coast. The District intends to create a new parking lot and greenspace area in order to accommodate overflow vehicle parking caused by a high number of users at Pillar Point Harbor, launch ramp, local restaurants, retail businesses and local public beaches (to include Surfers Beach). Therefore, the District is currently requesting qualified firms or individuals to submit design, engineering, public outreach, permitting and construction management proposals for consideration. Selected Proposer will complete 90% design/engineering submittals within ninety (120) calendar days of Notice to Proceed (NTP) issuance.

Conceptual

Sidewalks / Parking Lot

$466,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
135
Bidding Soon
2,892
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

Project location map

Ave Alhambra, El Granada, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.