Published May 1, 2025 at 8:00 PM
Updated May 2, 2025
Site work, new construction and renovation of a water / sewer project in Union City, Indiana. Completed plans call for the expansion of a wastewater treatment plant.
The project includes the addition of new high service pumps, new pressure filters, upsizing some plant process piping, and a new larger backwash tank structure to provide a complete expanded water treatment plant The Work under this Contract Item includes installing erosion and sediment control devices as shown on the Drawings and specified herein complete with all labor, material, and equipment necessary; along with maintaining and repairing/replacing these devices if determined necessary by the Engineer. Contractor is responsible for meeting erosion control requirements of local, county, and state authorities throughout the project. The Work under this Contract Item includes installation, integration, and verification of flow meter and its vault as specified herein and shown on the contract documents, complete. The Work under this Contract Item includes installation, integration, and verification of operational high service pump work along with all associated valves and fittings and any other High Service Pump Room work necessary to construct the complete project. The Work under this Contract Item includes furnishing and installing all concrete, reinforcement and ancillary equipment needed to install a working backwash tank expansion as shown on the project drawings and specified herein. The Work under this Contract Item includes furnishing and installing all process piping on the site and in the building specified in the contract documents not covered by other contract items including altitude valve and necessary chlorine room adjustments. The Work under this Contract Item includes all SCADA equipment, installation, and integration as shown on the project drawings and specified herein for a complete and operational SCADA system. The Work under this Contract Item includes all electrical equipment, installation, and integration as shown on the project drawings and specified herein for a complete and operational system. The Work under this Contract Item includes all work specified herein and depicted or described on the project documents not covered by any other contract item. The Work under this Contract Item includes all work specified by the City and AEP to relocate the OHE utility feeding the South Wellfield underground. Contractor to work with AEP and the City to determine final extents. The Work under this Contract Item includes all equipment, labor, and ancillary equipment necessary to install an operational wellhouse and well pump, complete with SCADA and electrical, as shown on the drawings and specified herein. The Work under this Contract Item also includes clearing and grubbing, excavation, removal, and disposal of excavated materials as required, trench and excavation support, potholing, installing and backfilling the pipe, associated fittings, and joint restraints, and abandoning existing pipe if described, as well as connecting to existing raw water line complete with all labor, material, and equipment necessary to install the water main to the lines shown on the Drawings by the method stated on the drawings when indicated, and specified herein in addition to all other work required or incidental thereto. Include the following: 1. Product name and model number. Use designations for products indicated on Contract Documents. 2. Manufacturer's name. 3. Equipment identification with serial number of each component. 4. Equipment function. 5. Operating characteristics. 6. Limiting conditions. 7. Performance curves. 8. Engineering data and tests. 9. Complete nomenclature and number of replacement parts. A. The work required under this section includes the provision, installation, start-up, testing and calibration of all field mounted instruments required for this project. B. The types of field mounted instruments required for this project include the following: 1. Level (float) Switches. 2. Pipe Mounted Pressure Sensor. 3. Magnetic Flow Meters. 4. Radar Level Transmitter. 5. Chlorine Residual Analyzer. A. The work required under this section includes the provision, installation, start-up, testing and calibration of all computer, controller, software and networking required for this project. B. The types of systems required for this project include the following: 1. AB CompactLogix 5380 Process Controller 2. MapleSystems HMI 3. Desktop Computer C. The Systems Integrator shall be responsible for work of this division. Contractor for this project will have scope of work associated with Division 25; see Electrical drawings and Process drawings for associated information. D. Provide Owner with original licenses for all copies of all software, for all equipment and systems provided in Division 25. Provide the Owner with software version and printed documentation of all documented programs, as part of Record Documents and Operation and Maintenance Manuals. Provide the Owner with all passwords required for full program access for all levels of PLC, PC, HMI, LAN and VPN network programming. The Owner shall have full legal right to use without restriction, and modify if they choose at their own risk, all programs, screens and reports prepared for this project, for their use in operating, maintaining, and managing their facilities. A. The Common Work Results for Electrical apply to all electrical materials, equipment, installations, and services supplied under any portion of the work. The Contractor shall coordinate the Common Work Results for Electrical as applicable to any equipment, installations, and services of an electrical nature. B. It is the intention of this Division of the Specifications and the accompanying drawings to describe and provide for the furnishing, installing, testing and placing in satisfactory and successful operation all equipment, materials, devices and necessary appurtenances to provide a complete electrical system, together with such other miscellaneous installations and equipment hereinafter specified and/or shown on the plans. The work shall include all materials, appliances and apparatus not specifically mentioned herein or noted on the plans, but which are necessary to provide a complete working installation of all electrical systems shown on the plans or described herein. Equipment and devices furnished and installed under other Divisions of this specification (or by the Owner) shall be connected under this Division. The drawings and specifications are complementary and what is called for in either, is binding as if called for in both. C. The contract drawings indicate the extent and the general location and arrangement of equipment, conduit and wiring. The contractor shall study plans and details and shall cooperate with all other trades to prevent conflict and interference as to space requirements. Fixtures, equipment and outlets shall be located to avoid interference with mechanical or structural features. Lighting fixtures shall be symmetrically located according to the room arrangement. Raceways, junction and outlet boxes, lighting fixtures, and all other electrical equipment shall be properly supported to comply with applicable codes and good work practices. D. The Electrical Contractor is responsible for installation of a complete and operating electrical system in accordance with the intent of the drawings and specifications. E. The scale of drawings cannot show all necessary transitions, offsets, changes in direction, etc. It shall be the responsibility of the Electrical Contractor to provide all pull boxes, elbows, fittings, supports, etc. necessary to install his work to conform to structures, to preserve headroom and to keep openings and passageways clear. F. Electrical diagrams are schematic and diagrammatic only, not necessarily to scale, and do not necessarily show physical arrangement of equipment. Electrical diagrams and plans are complementary and what is shown on either is the same as if shown on both. G. The horsepower of motors and equipment wattages indicated on the plans are based on information made available to the Engineer and field notes of existing installation, and are as accurate as practical; however, there may be discrepancies. All wiring, switches, circuit breakers, and magnetic motor starters shall be of size and capacity to suit the horsepower of the motors and equipment actually furnished, and actually being connected; however, in no case shall wiring, switches, circuit breakers and magnetic motor starters be of smaller capacity or size than those indicated on the drawings or specified unless approved, in writing, by the Engineer. H. Any minor changes in the location of all equipment, switchboards, panelboards, starters, fixtures, conduits, outlets, etc. from those shown on the plans shall be made without extra charge if so directed by the Engineer or Owner before installation. 1. Minor changes in location shall be defined as within 15 feet in any direction, horizontally or vertically, from the location indicated on the drawings. I. Make detailed arrangements with the Owner for selected electrical service work and any/all shutdowns required. 2. Provide temporary services when required: The Contractor shall be responsible for, and bear the cost of, all temporary service or equipment feeders which may be required. 3. All shutdown and power transfer work must be closely scheduled with the Owner, approved in advance by the Owner, and at the convenience of the Owner; and shall be performed only with the Owner present and/or under direct/indirect supervision of the Owner. 4. Power shutdowns and transfers must be scheduled with the Owner and all such shutdowns and transfers shall be scheduled at the Owner's convenience. At the Owner's discretion, work may be required to be performed on holidays, weekends, evenings, early mornings, and during similar non-standard work periods, without additional cost to the Owner. a. The above requirement for performing work during non-standard work periods also applies to any work that can only be safely performed during a power shutdown. A. This item shall consist of temporary control measures as shown on the Drawings or as ordered by the Owner during the life of the Contract to control water pollution, soil erosion, and siltation using berms, dikes, dams, sediment basins, fiber mats, gravel, mulches, grasses, slope drains, and other erosion control devices or methods. B. Temporary erosion control measures contained herein shall be coordinated with the permanent erosion control measures specified as part of this Contract to the extent practical to assure economical, effective, and continuous erosion control throughout the construction period. C. Temporary control may include work outside the construction limits such as borrow put operations, equipment, and material storage sites, waste areas, and temporary plant sites. SCOPE OF WORK A. This project includes but is not limited to the following: 1. Plant PLC replacement. 2. Lift Pump Control Panel. 3. Remote Telemetry Unit for wells and tanks. 4. Level and pressure sensing transmitters. 5. Level Float Switches. 6. Miscellaneous status monitoring and alarms. 7. CompactLogix 5069-320ER programmable controller. 8. Ethernet based CompactLogix remote IO equipment. 9. Desktop and Color Touchscreen SCADA computers. B. Instrumentation & Control General Descriptions 1. The Instrumentation and Control System shall include all work necessary to monitor and control processes, unless otherwise noted. 2. There shall be remote well and tank site Point IO to communicate with the plant CompactLogix programmable controller to control all operations of the facility. C. The Systems Integrator subcontractor (SI) shall be responsible for work of this division. PreApproved System Integrators are: 1. Toric Engineering (Owner preferred vendor) 2. Or approved other
Post-Bid
Water / Sewer
$800,000.00
Public - City
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
April 21, 2025
Multiple Locations, Union City, IN
Related To This Project
Union City, IN
Bid Date: Apr 03 2025
Union City, IN
Bid Date: Apr 10 2025
Union City, IN
Bid Date: Oct 27 2025
Union City, IN
Bid Date: Apr 03 2025
Union City, IN
Bid Date: Jul 22 2019
Union City, IN
Bid Date: Oct 09 2024
Union City, IN
--
Union City, IN
Bid Date: May 09 2024
Union City, IN
Bid Date: Dec 15 2020
Union City, IN
Bid Date: Feb 01 2024
Union City, IN
Bid Date: Jul 22 2019
Union City, IN
Bid Date: Mar 10 2022
Union City, IN
Bid Date: Jul 18 2023
Union City, IN
Bid Date: Sep 18 2023
Union City, IN
Bid Date: Apr 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.