BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Chandler, Arizona. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Arizona Avenue and Warner Road intersection has been identified by the Maricopa Association of Governments (MAG) as a high-crash location, ranking among the top 50 in the region. A Road Safety Assessment (RSA) conducted in 2021 outlined critical modifications to enhance safety and reduce the incidence of left-turn and angle collisions. The primary recommendation involves the installation of dual left-turn lanes for both northbound and southbound traffic on Arizona Avenue, coupled with updated signal phasing to optimize traffic flow and reduce conflicts. However, recent findings by the project designer indicate that the original plan to re-stripe lanes is insufficient due to geometric constraints. Specifically, the intersection requires widening to meet the design standards established by AASHTO and FHWA. The receiving lanes on Warner Road do not meet the minimum width requirements for dual left turns, necessitating additional lane construction. To accommodate these changes, the northwest corner will require a temporary construction easement, and the traffic signal infrastructure must be relocated and upgraded. This improvement aligns with MAG's Strategic Transportation Safety Plan (STSP) goals of reducing crash severity and enhancing multimodal safety, considering the intersection serves as a critical corridor for vehicles, pedestrians, and cyclists. Additionally, the modifications include upgrading pedestrian push buttons, improving lighting, and replacing outdated traffic poles. These comprehensive changes are essential to support current and projected traffic volumes and ensure compliance with safety guidelines. The need for additional funding arises from the expanded scope of work, including the widening of Warner Road to add a third lane in each direction, modifications to the median, and adjustments to accommodate the turning radii required for dual left turns. These enhancements are crucial for improving safety and efficiency at one of Chandler's busiest intersections. The Project is Included in the City's 2026-2031 Capital Improvement Program (CIP). As of April 10, 2026, Further Details Have Not Yet Been Identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$4,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
68
Bidding Soon
1,198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.