BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated April 2, 2025

This is a service / maintenance or supply contract in Williston, Florida. Contact the soliciting agency for additional information.

The City of Williston hereby request proposals from qualified individuals or firms to provide grant administration services for HUDs Community Development Block Grant Mitigation (CDBG-MIT) program for the following projects: Service Area #1 Sanitary Sewer Collection Upgrades Lift Station Number 4 Rehabilitation Service Area: 03J Sewer Line Replacement The City of Willistons Sanitary Sewer Lift Station Number 4 has aging components and is in need of rehabilitation. The project proposed in this application is the demolition and replacement of the Citys sanitary sewer Lift Station Number 4. The improvements will include demolition, site work, installation of new lift station, installation of new manhole, restoration of driveways and street pavement disturbed by the work. Work to be included: Demolish Existing Lift Station Components New Sanitary Sewer Manhole and Piping Install New Complete Lift Station with all appurtenances Connect to Existing Force main Complete Site Work and Install New Fencing Repair Roadway Disturbed and Provide Access Drive Service Area #2 Street Repaving SE 10th Street, SE 9th Terrace, and SE 9th Street Service Area: 03K Street Improvements - Repaving The City of Willistons SE 10th Street, SE 9th Terrace and SE 9th Street are cracked, patched and deteriorated. The project proposed in Service Area #2 of this application is the resurfacing of these three streets. The improvements will include repaving of these streets to ensure safe ongoing access for the residents living on these streets as well as for emergency personnell serving these residents. Repaving will include repaving on SE 10th Street southward from E. Noble Avenue for approximately 2,100 linear feet; repaving of SE 9th Terrace southward from E. Noble Avenue approximately 1,000 linear feet to SE 2nd Avenue; and repaving of SE 9th Street southward from E. Noble Avenue approximately 1,100 linear feet. Question Deadline 03/15/2025 Deadline for issuing of Addenda: March 25, 2025

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

Project location map

Multiple Locations, Williston, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.