Renovation of a museum in Winnipeg, Manitoba. Completed plans call for the renovation of a museum.

The work is being done in Manitoba Centennial Centre Corporations Museum Research Tower and Heating Plant located at 190 Rupert Avenue, Winnipeg, MB. The scope of work includes, but is not limited to, removal and replacement of tower roof, penthouse roof on tower and heating plant roof replacement including mechanical and electrical equipment removal and reinstallation. Work site location will be partially occupied during construction. A performance bond of fifty percent (50%) of the contract price for the Project containing the same terms and conditions as the specimen performance bond included as Schedule A of Appendix 4 (Bonding Requirements) of the Agreement; and A labour and material payment bond of Fifty Percent (50%) of the cost of the Project containing the same terms and conditions as the specimen labour and material payment bond included as Schedule B of Appendix 4 (Bonding Requirements) of the Agreement. Wrap-Up Liability insurance in the joint names of the Contractor, the Owner, the Consultant and all Subcontractors and sub consultants involved with the Work with limits of not less than $10,000,000 per occurrence and a deductible not more than $10,000. The insurance coverage shall be primary to all other insurance policies and shall not be substantially less than the insurance provided by IBC Form 2100 (including an extension for a standard provincial and territorial form of non-owned automobile liability policy) and IBC Form 2320, except for liability arising from damage to the Project during construction, which shall be limited to the completed operations period. The insurance shall be maintained from the date of commencement of the Work until 90 calendar days after the date of Ready-for-Takeover. The policy must provide coverage for completed operations hazards from the date of Ready-for-Takeover on an ongoing basis for a period of 2 years following Ready-for-Takeover." Question Acceptance Deadline: 2025/03/25 04:00:00 PM CDT Proponents should promptly examine all of the documents comprising this RFP and may direct questions or seek additional information in writing by email to the RFP Contact on or before the Deadline for Questions. No such communications are to be directed to anyone other than the RFP Contact. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Museum

$500,000.00

Public - State/Provincial

Renovation

24

14

8

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
48
Bidding Soon
542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 1, 2025

Project location map

190 Rupert Ave, Winnipeg, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.