EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2025 at 8:00 PM

Updated October 1, 2024

Demolition, paving, renovation and addition to an educational facility in Brewster, New York. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for paving for a educational facility.

Please note REVplans is the designated location and means for distributing and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. All bid addenda will be transmitted to registered plan holders via email and will be available at website Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Proposals must be submitted on the Form provided by the Architect with all blanks appropriately filled in. They must be submitted in a sealed envelope bearing on the outside the name and address of the bidder and title of the Project as noted above. All bid prices shall be filled in, both in words and figures. Signatures shall be in ink and in longhand. Proposals which are incomplete, conditional, or obscure may be rejected as informal. Additional copies of the Proposal Form will be furnished by the Architect upon request. BrewsterPurchase plans+Follow projectDownload FilesCSD - HighSchool FieldHouseFitnessCenterBids due 04/09/2025 2:00pmOBrewster, NY 1050923505.04DetailsBid DocumentsPlan HoldersSubs & SuppliersContractsGCContract #1PContract #1Prebid Date: 03/25/2025 2:30pmPrebid Date: 03/25/2025 2:30pmBid Date: 04/09/2025 2:00pmBid Date: 04/09/2025 2:00pmHContract #3EContract #4Prebid Date: 03/25/2025 2:30pmPrebid Date: 03/25/2025 2:30pmBid Date: 04/09/2025 2:00pmBid Date: 04/09/2025 2:00pmDescriptionINVITATION TO BIDSealed Proposals for the:BREWSTER HIGH SCHOOLWELLNESS CENTER ADDITION, INTERIOR RENOVATIONS & RELATED WORKWill be received by:BREWSTER CENTRAL SCHOOL DISTRICT30 Farm to Market RoadBrewster, New York, 10509Proposals must be received on or before 2:00 PM, local time on 04/9/2025 and must be inaccordance with the requirements of the Bidding Documents to receive consideration.Bidding Documents, including drawings and specifications, will be available beginningon 03/11/2025.The Contract Documents may be examined at the Office of the Architect, Fuller & D'AngeloArchitects and Planners, P.C., 45 Knollwood Road, Elmsford, NY (914) 592-4444; however,complete digital sets of Bidding Documents, drawings and specifications, may be obtained online(with a free user account) as a download for a non-refundable fee of One-Hundred ($100.00)Dollars at the following website: https://revplans.biddyhq.comPlease note REVplans (https://revplans.biddyhq.com) is the designated location and means fordistributing and obtaining all bid package information. Only those Contract Documents obtained inthis manner will enable a prospective bidder to be identified as an official plan holder of record. TheProvider takes no responsibility for the completeness of Contract Documents obtained from othersources. Contract Documents obtained from other sources may not be accurate or may not containaddenda that may have been issuedAll bid addenda will be transmitted to registered plan holders via email and will be available athttps://revplans.biddyhq.com. Plan holders who have paid for hard copies of the bid documents willneed to make the determination if hard copies of the addenda are required for their use, andcoordinate directly with the printer for hard copies of addenda to be issued. There will be no chargefor registered plan holders to obtain hard copies of the bid addenda.The bids will be opened and read aloud immediately following the bid receipt at the BREWSTERCENTRAL SCHOOL DISTRICT, Business Office Board Room, 30 Farm to Market Road, Brewster,New York, 10509.Proposals must be submitted on the Form provided by the Architect with all blanks appropriatelyfilled in. They must be submitted in a sealed envelope bearing on the outside the name andaddress of the bidder and title of the Project as noted above.All bid prices shall be filled in, both in words and figures. Signatures shall be in ink and in longhand.Proposals which are incomplete, conditional, or obscure may be rejected as informal. Additionalcopies of the Proposal Form will be furnished by the Architect upon request.No oral or telephonic proposals or modifications of proposals will be considered.A non-mandatory pre-bid conference will be held on 03/25/2025, at 2:30 PM.Bidders are requestedto meet at the front entrance of Brewster High School located at 50 Foggintown Road, Brewster,NY 10509.Lump Sum Bids will be received for four (4) Prime Contracts:Contract #1 General Construction.Contract #2 PlumbingContract #3 HVACContract #4 Electrical

Post-Bid

Educational

$600,000.00

Public - City

Addition, Demolition, Paving, Renovation

182

30

14

2

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Fabricator Qualifications, Installer Qualifications, Manufacturer?s Field Services, Quality Control, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Cast Decks and Underlayment, Cast Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Railings, Pipe and Tube Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Metal Roof Panels, Siding, Flashing and Sheet Metal, Sheet Metal Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Louvers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wire Mesh Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Commercial Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Controls, Lifts, Wheelchair Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Storm Drainage Piping Specialties, Roof Drains, Sump Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Vibration and Seismic Controls for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Central HVAC Equipment, Packaged Outdoor HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Decorative Metal Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Storage, Gas and Liquid Storage Equipment

Find More Local Projects

Within 75 Miles of This Project
510
Active Projects
320
Bidding Soon
4,846
All Active Projects
2,066
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

December 1, 2026

img_map_placeholder

50 Foggintown Rd, Brewster, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Brewster High School Wellness Center Addition - GC

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.