Site work and paving for a road / highway in Akron, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.
2025 Summit County Regional Concrete Repair Program SCOPE OF WORK 1) Bath Township. Saw cut as needed, remove concrete slabs as determined by the engineer, excavate sub-grade and backfill with Item 304 as needed, pour new concrete slabs and other incidental work to complete the pavement repairs. Sidewalk replacement is also included in this scope of work. Traffic maintenance will be the contractor's responsibility during this work. 2) Copley Township - Saw cut as needed, remove concrete slabs as determined by the engineer, excavate sub-grade and backfill with Item 304 as needed, pour new concrete slabs and other incidental work to complete the pavement repairs. Traffic maintenance will be the contractor's responsibility during this work. 3) Sagamore Hills Township - Saw cut as needed, remove concrete slabs as determined by the engineer, excavate sub-grade and backfill with Item 304 as needed, pour new concrete slabs and other incidental work to complete the pavement repairs. Traffic maintenance will be the contractor's responsibility during this work. 4) Springfield Township - Saw cut as needed, remove concrete slabs as determined by the engineer, excavate sub-grade and backfill with Item 304 as needed, pour new concrete slabs and other incidental work to complete the pavement repairs. Traffic maintenance will be the contractor's responsibility during this work. 5) Twinsburg Township - Prepare and perform miscellaneous repairs as listed in the Plans and Details. Saw cut as needed, remove concrete slabs, curb or sidewalk as determined by the engineer, excavate sub-grade and backfill with Item 304 as needed, pour new curb and gutters, curb ramps, sidewalk and other incidental work to complete the pavement repairs. All repair costs shall include removal of existing item and patching of surroundings as need to perform these repairs. The cost of new curbs will be included in Item 255 Rigid Pavement Removal and Replacement. Cost for topsoil, seeding , and mulching will be included in bid items 255 and 608. Traffic maintenance will be the contractor's responsibility during this work. 6) For work on township and village roads, the township or village in which work is being performed under this contract shall be a third-party beneficiary of this contract and shall have direct recourse against the contractor should a dispute arise as to the work done in that township or village on its roads. 7) Payment requests shall be submitted to the Engineer as provided in section 22 of the General Provisions, but payment for work on township and village roads shall be made to the contractor by the respective township and village, directly, upon approval of invoices by the Engineer.
GC Bidding
Roads / Highways
$546,594.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Division 04 - Masonry
Division 10 - Specialties
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
June 7, 2025

Multiple Locations, Akron, OH
Related To This Project
Akron, OH
Bid Date: Apr 02 2025
Akron, OH
Bid Date: Apr 09 2025
Akron, OH
Bid Date: Mar 21 2025
Akron, OH
--
Akron, OH
--
Akron, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.