Published November 14, 2025 at 7:00 PM

Updated November 25, 2025

Site work for a civil project in Calgary, Alberta. Completed plans call for site work for a road / highway; and water / sewer project.

TOWNSHIP ROAD 250 REALIGNMENT FROM 200M EAST OF RGE RD 285 TO 930M EAST OF RGE RD 284 GRADING, CULVERT INSTALLATION, GRANULAR BASE COURSE, CONCRETE WORK, ASPHALT CONCRETE PAVEMENT (EPS), TRAFFIC SIGNALS, SIGNAGE, POND CONSTRUCTION & OTHER WORK. Rocky View County (County) will be realigning Township Road 250 from 200m east of Range Road 285 to 930m east of Range Road 284, (approximately km 0.170 to km 2.620) tying into the existing 4-lane divided highway at the west end and the existing 2-lane undivided highway at the east end (the Project). The Project will be constructed in two (2) phases to achieve the ultimate 4 lane undivided highway. For the purposes of this Phase 1 RFPQ the ultimate subgrade will be constructed to accommodate four (4) lanes of undivided traffic. The gravel and asphalt structure will be constructed on the two (2) south lanes which will be completed for public use in Phase one (1) for the Contractor to pre-qualify. Major components of the Work for the Township Road 250 Realignment Project - Phase 1 shall include, but may not be limited to the following: Township Road 250 Realignment – 4 lane subgrade construction from 0+170 to 2+630 and 2 lane road construction from 0+680 to 2+630 Subgrade Excavation 250 m3 Cutting of Pavement 890 m Remove and Dispose Asphalt Concrete Pavement 390 m3 Cold Milling Asphalt Pavement (0.5m butt joint) 280 m2 Common Excavation 57,000 m3 Borrow Excavation - Contractor Supplied 47,500 m3 Excess Topsoil removed from site 19,400 m3 Non-Woven Geotextile - Supply and Install 2,000 m2 Channel Excavation 600 m3 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 5 m Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 50 m Culverts - Supply and Install (1050 mm dia. C.S.P.) 8 m Culverts - Supply and Install (600 mm dia. C.S.P.) 220 m Culverts - Supply and Install (450 mm dia. C.S.P.) 66 m Preparing Subgrade Surface - 1st Layer 38,000 m2 Preparing Subgrade Surface - 2nd Layer 38,000 m2 Granular Fill (Des 6 Class 80) 28,000 tonne Granular Base Course (Des 2 Class 25) 22,000 tonne Asphalt Concrete Pavement (EPS) - H1 (PG 58-28) 11,000 tonne Concrete Curb and Gutter (0.5m pan) - Semi-mountable Curb 280 m Concrete Median Surfacing 510 m2 Median Fill 250 tonne Topsoil Placement 37,000 m2 Drill Seeding 3.70 ha Erosion Control Barrier (Silt Fence) – Supply and Install 1,500 m Removal of Existing Painted Lines 880 m Roadway Lines (Directional Dividing and 2 Edge Lines) 2.50 km Intersection Lines - Supply Paint and Painting 2 intersections Painted Pavement Message – Arrows 13 messages Painted Pavement Message – Stop Bar 10 messages Painted Pavement Message – Railway Crossing 2 messages Remove and Dispose of Existing Fence 1.60 km New Fence (Class B) - Supply and Install 4.20 km New Fence (Wooden Plank) - Supply and Install 0.30 km Existing Steel Gate - Remove, Salvage and Reinstall 4 units Remove and Reinstall or Disposal of Existing Signs - one post 6 signs Remove and Reinstall or Disposal of Existing Signs - two post 1 sign New signs - Aluminum - Supply 18.12 m2 New signs - less than 1m2 - Install - one post 44 signs Wooden Posts (100 x 150 mm) - Supply and Install 26 posts Steel Posts c/w breakaway bracket - Supply and Install 10 posts Flexible Guide Post / Delineator - Round - Supply and Install 140 posts Traffic Signals System (RR 284 Intersection) - Supply and Install 1 lump sum Precast Concrete Street Light Base - Supply and Install 12 units Street Light Standard - Supply and Install 12 units Street Lighting Electrical Conduit - Trench Excavation 800 m Pond Construction - Topsoil Stripping 17,000 m3 Pond Construction - Pond Excavation 70,000 m3 Pond Construction - Topsoil Placement 2,600 m3 The scope of work for this project generally includes, but is not limited to, the following: Act as Prime Contractor for all components of the Work Traffic accommodation during construction Erosion and sediment control during construction Subgrade construction Excavation and earthworks Culvert removal and install Road construction, including granular base and paving Traffic signals and streetlights Concrete work, including curb, gutter, and medians Line painting and pavement markings Storm sewer and inlet construction Coordination with utilities and other stakeholders Coordination with Canadian National Railway crossing construction Coordination with adjacent landowners and developers, including their contractors Additionally, the projects shall be constructed in accordance with: The technical requirements of the Tender (not yet released); The Contract Drawings provided by the Consultant (not yet released); Alberta Transportation Construction Specifications (edition 16, 2019); Rocky View County Servicing Standards (2025); All applicable federal, provincial and municipal laws, codes, standards, regulations, and by-laws. All inquiries shall be directed to Rocky View County purchasing via email only: Purchasing Department Rocky View County Attention: Indra Ghosh Email: publicbids@rockyview.ca All inquiries shall be submitted by November 12 th , 2025, 4:00 pm local time.

Post-Bid

Roads / Highways

$21,267,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
17
Bidding Soon
557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.