Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 12, 2025 at 8:00 PM
Updated March 13, 2025
Site work for a civil project in Saint Louis, Missouri. Working plans call for site work for a water / sewer project.
Location: The City of Brentwood between South McKnight Road and Mary Avenue Voters in both the city of St. Louis and St. Louis County passed proposal W that was on the ballot April 2, 2024, for the bond issue for the Project Clear program. There are approximately 3 dozen projects involved; most have been completed. As part of a long-term effort to reduce basement backups and sewer overflows, MSD Project Clear is designing a project in the City of Brentwood to separate a combined sewer into two separate sewers, one for stormwater and one for wastewater. MSD Project Clear is investing approximately $30 million to separate the sewers in the City of Brentwood and increase the size of the wastewater and stormwater pipes. This will reduce the likelihood of basement backups in homes and businesses and will allow MSD to remove one constructed overflow point (known as a CSO) from its wastewater sewer system. This is the current tentative project schedule. This is subject to change based on a variety of factors including weather. Complete project design: Late Summer 2023 Easement acquisition completion: Late Summer 2025 Estimated construction start: Late Summer 2026 Estimated project duration: 3.5 years As of March 12, 2025, project is on-going and done in-house. This project is estimated to begin construction in the Summer of 2026.
Pre-Construction/Negotiated
Water / Sewer
$30,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2026
Multiple Locations, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Mar 28 2025
Saint Louis, MO
Bid Date: Apr 04 2025
Saint Louis, MO
Bid Date: Apr 02 2025
Saint Louis, MO
Bid Date: Apr 17 2025
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 28 2025
Saint Louis, MO
Bid Date: Apr 03 2025
Saint Louis, MO
Bid Date: Apr 10 2025
Saint Louis, MO
Bid Date: Jun 04 2025
Saint Louis, MO
Bid Date: Apr 18 2025
Saint Louis, MO
Bid Date: Apr 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
