Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated December 2, 2025
Site work and new construction of a clubhouse / community center in Taunton, Massachusetts. Completed plans call for the construction of a 3,260-square-foot clubhouse / community center; and for site work for a clubhouse / community center.
A. The work includes the complete removal and disposal of all asbestos containing materials (ACM) as indicated in Part 3 of this Section. B. The General Contractor shall retain the services of a Massachusetts licensed Asbestos Abatement/Demolition Contractor. The asbestos must include in his scope of work all required services included in Part 3 and must accept unit prices included at the end of this section to be used for add/deducting. All bidding Requests for Information (RFIs) shall be submitted online by 03/27/2025 at 2:00PM EDT for filed sub-bids and by 04/10/2025 at 2:00PM EDT for general bids. The Project consists of but not limited to New Construction of a 3,260 SF Community Center and finish site work including parking, paving, and curbing. Existing site preparation, foundation and slab work completed in previous phase. Phase Two Creative Placemaking New Community Center Project . Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
Award
Clubhouse / Community Centers
$2,666,247.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
June 16, 2025
To Be Determined, Taunton, MA
Related To This Project
Taunton, MA
Bid Date: Apr 09 2025
Taunton, MA
Bid Date: Mar 19 2025
Taunton, MA
Bid Date: Apr 02 2025
Taunton, MA
Bid Date: Apr 11 2025
Taunton, MA
Bid Date: Apr 09 2025
Taunton, MA
Bid Date: Apr 29 2025
Taunton, MA
Bid Date: Apr 16 2025
Taunton, MA
--
Taunton, MA
Bid Date: Apr 03 2025
Taunton, MA
--
Taunton, MA
Bid Date: Mar 06 2025
Taunton, MA
Bid Date: Feb 27 2025
Taunton, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
