Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 22, 2025 at 8:00 PM
Updated April 23, 2025
Renovation of a municipal facility in Madison, Wisconsin. Completed plans call for the renovation of a municipal facility.
Fire Sprinkler Replacement Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. A. This section applies to all Division 21 sections. B. Comply with requirements of State of Wisconsin, IBC, NFPA Standards and local Fire Chief or Fire Marshal (AHJ, Authority Having Jurisdiction) regarding design, materials and installation. C. Prepare engineering drawings and submit to Authority Having Jurisdiction for plan review, pay all plan review fees. D. Obtain and pay for all required State or local installation inspections except those provided by the Architect/Engineer in accordance with City of Madison and State of Wisconsin. Deliver originals of these certificates to the Owners construction representative. Include copies of the certificates in the Operating and Maintenance Instructions. E. Contractor is responsible for final design and permitting. 1. Plans may indicate Hazard categories and other information. Contractor is required to be knowledgeable about those categories and apply a different category if code and/or JHA requires. 2. Plans may show sprinkler heads and other equipment. This is done for coordination with other trades and for architectural reasons. This contractor shall adjust actual number and location of devices as required by code or JHA, while meeting all coordination and aesthetic requirements. 3. Include all required supervisory switches F. Extensions or modifications to existing sprinkler systems shall include all required equipment and modifications required to meet all code and project requirements. This includes but is not limited to upsizing and addition of pipes, addition or replacement of sprinklers etc. G. Existing systems shall maintain its function until new system is operational. For intermediate fire protection, temporary system elements shall be provided in accordance with AHJ. Question Deadline: 03/20/2025 Contract Compliance Department of Civil Rights City-County Bldg., Room 523 210 Martin Luther King, Jr. Blvd. Madison, WI 53703 PH: (608) 266-4910 dcr@cityofmadison.com
Award
Municipal
$514,274.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
May 1, 2025
4602 Sycamore Ave, Madison, WI
Related To This Project
Madison, WI
--
Madison, WI
Bid Date: Apr 03 2025
Madison, WI
--
Madison, WI
Bid Date: Jul 24 2025
Madison, WI
Bid Date: Jun 25 2025
Madison, WI
Bid Date: Mar 27 2025
Madison, WI
--
Madison, WI
Bid Date: Mar 27 2025
Madison, WI
Bid Date: Jul 29 2021
Madison, WI
--
Madison, WI
Bid Date: Mar 27 2025
Madison, WI
--
Madison, WI
--
Madison, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
