BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Renovation of an educational facility in Lac La Biche, Alberta. Completed plans call for the renovation of a educational facility.

Portage College is calling for Mechanical Contractors to assist us with the completion of two (2) projects, for the Server Room Area: A. PRJ#2025-008 - HVAC Modification for Exhausting Heat. A method of exhausting heat from the Server Room, in the event of the Server Room Air Conditioning Units failure. A simple use of ducts (existing or new) and fans to remove the hot air for emergencies only. For the new emergency ducting, we request a system not requiring complexity, such as, 3 phase electrical or refrigeration. KEEP IT SIMPLE. This work must be completed prior to June 15, 2025. B. PRJ#2025-CMR - Server Room Air Conditioning & UPS Replacement. Removal of existing units, while maintaining AC in the Server Room. We expect to remove and replace one (1) unit as at time, not to interrupt the College's Business. All IT servers must remain operational during this project, with as little dust as possible. Replace existing AC Units with Two (2) Vertiv PDX Air Cooled Server Room AC units, Model Number: PX018UA1BP034H or equivalent. Remove old condenser units and lift new condensers to roof and connect power connections. Include price for crane to lift units. Proper recovery of refrigerants. New Electrical and Ducting as required by the project (BMS by current vendor). Pressure test existing refrigerant lines, flush pipe to clean old oil out of system and fit to new units. Pressure test entire system, evacuate to 500 microns and field charge refrigerant into unit. Start-up of first system, once completed second unit will be taken down in same order and installed. Start-up of second unit and confirm drain condensate pumps are functioning, Add balancing dampers into duct work to balance airflow in room 80% front loaded 20% rear. Replace all suction line insulation Commission and start warranty period at the end of the project. All units to have the same warranty period and duration. Indicate options for extended warranty. The scope of the project has been prepared with the assistance of Modern Niagara and PowerHouse Group. The methodology for this project has been decided, but Portage College is willing to consider other equivalent options. We are unable to shut down the building during normal working hours (0800-2100 Daily), therefore, all work will be performed while Staff and Students are in the hallways. There will be opportunity for to discuss further at the Contractor Pre-Bid Meeting. Award amount was not released for publication.

Award

Educational

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
59
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

June 1, 2025

Project location map

9531 94 Ave, Lac La Biche, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.