BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work for a water / sewer project in Lancaster, Pennsylvania. Completed plans call for site work for a water / sewer project.

**As of May 13, 2025, the project was awarded to AIS dba Heisey Mechanical, and PSI Pumping Solutions Inc., with an awarded amount of $2,260,187** MULTI PRIME Advanced Wastewater Treatment Plant South Primary Clarifier Upgrades Project Questions Due Date: Apr 16th 2025, 4:00 PM EDT The Project involves two (2) prime contracts: (a) General Construction and (b) Electrical. In general, the work under this contract consists of furnishing all labor, materials, equipment, and incidentals for replacing process mechanical and electrical equipment, rehabilitating the clarifier structures, and upgrade the equipment controls system for the four (4) Primary Clarifiers at the South Train of the City's AWWTP. The AWWTP is located in Lancaster Township. The successful bidder shall be required to comply with all applicable laws protecting individuals from discrimination. The Project and contract are subject to certain requirements, including to make payment of certain minimum salaries and wages and compliance with the Steel Products Procurement Act and other applicable requirements of federal and state law. The City will determine who is the lowest responsible bidder(s) upon the basis of the bids submitted. The lowest responsible bidder(s) need not be the bidder submitting the lowest dollar amount. The City may consider the quality of services supplied, responsiveness of the bidder, past performance of the bidder, compatibility of the bidder's processes with other City services, the bidder's ability to handle the volume of work proposed, the ability of the bidder to work with other contractors in the context of a multi-prime contract. Further, consideration will be given to such matters as contractor integrity, compliance with public policy, record of past performance, and financial and technical resources. The City reserves the right to reject the bid of any bidder not possessing satisfactory qualifications. The City reserves the right to reject any or all bids and re-advertise if the best interest of the City will thereby be promoted. The City also reserves the right to waive technical defects if in its judgment, the interest of the City shall so require. The City further reserves the right to waive any informalities in the bids received and reject any or all bids for any reason whatsoever. Included in its right to reject bids, is the right for the City, in its sole discretion, to reject bids which are deemed by the City to be incomplete, conditional, or obscure, or which contain additions, erasures, alterations, omissions or irregularities of any kind. The project involves two (2) prime contracts: 1. General Construction (2023-33-01) 2. Electrical (2023-33-02) In general, the work under this contract consists of furnishing all labor, materials, equipment, and incidentals for replacing process mechanical and electrical equipment, rehabilitating the clarifier structures, and upgrade the equipment controlssystem for the four (4) Primary Clarifiers atthe South Train of the City's AWWTP. The AWWTP is located in Lancaster Township. SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation work and grading; place and compact backfill and fill; and dispose of unsuitable, waste and surplus materials as shown on the Drawings and as specified herein. B. Provide the services of a licensed professional engineer registered in the State in which the work is located, to prepare temporary excavation support system designs and submittals. C. Furnish and install temporary excavation support systems, including sheeting, shoring and bracing, to insure the safety of personnel and protect adjacent structures, piping, etc, in accordance with Federal, State and local laws, regulations and requirements. 2023-33-2 Bid Results General Construction Ais Dba Heisey Mechanical - - $1841429 Electrical Psi Pumping Solutions Inc - $418758

Award

Water / Sewer

$2,260,187.00

Public - City

Site Work

42

33

35

10

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
593
Active Projects
277
Bidding Soon
3,564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

June 23, 2025

Project location map

1220 New Danville Pike, Lancaster, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.