Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Site work and outdoor lighting for a playground / park / athletic field in El Monte, California. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

The proposed work consists of installation amenities at the newly constructed Merced Linear Park ("Heroes Park"). Amenities include solar lighting, relocation of the existing monument sign, solar uplighting for the park monument sign, park signage, exercise equipment, and removable bollards. The Engineer's estimate for the project is $150,000. Project Duration 30 Working Days Time is of the Essence: The Contractor must complete the project no later than June 13, 2025 as this project is funded by the Clean California Local Grant Program (CCLGP) which has set strict deadlines for project completion. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The City reserves the right to reject any and all Bids. The City further reserves the right to waive immaterial irregularities in any Bid. Any Bid not conforming to the intent and purpose of the Contract Documents may be rejected. The City reserves the right to make all awards in the best interest of the City. Online Q&A Yes Q&A Deadline 03/10/2025 12:00 PM (PDT)

Award

Playgrounds / Parks / Athletic Fields

$155,250.00

Public - City

Outdoor Lighting, Site Work

4

8

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
667
Active Projects
290
Bidding Soon
4,346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Merced Ave, El Monte, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed