BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 1, 2025

Site work and paving for a mixed-use development in Rialto, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Replacement of curb gutters, driveway approaches, sidewalks, curb ramps and all appurtenant work. The Work comprises the furnishing of all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder include traffic control; implementation and maintenance of Best Management Practices; construction survey and monumentation; installation, removal or replacement of curb, gutters, driveway approaches, sidewalks, curb ramps and all appurtenant work on various streets as identified in the construction documents. This project is funded in whole or part by a Community Development Block Grant (CDBG). The Engineer's estimate is $145,000. Liquidated Damages $1900/Calendar day Project Duration 21 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 03/11/2025 2:00 PM (PDT) The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, on the basis of the total sum of the Base Bid Schedule and reject all other bids, as it may best serve the interest of the City.

Award

Sidewalks / Parking Lot

$125,924.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
257
Bidding Soon
3,733
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

Project location map

Multiple Locations, Rialto, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.