BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated October 8, 2025

Site work and paving for a transportation facility in Rockford, Illinois. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**As of August 13, 2025, this project has not yet been awarded.The project is expected to be awarded for at least another 4 weeks.** Reference Number 0000387624 Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - FOB Destination - Installation Required - Insurance Required - Local Service Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % A bid bond, cashier's check, or a certified check made payable to the order of the Chicago Rockford International Airport in the amount of ten percent (10%) of the total bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. Question Deadline 06/10/2025 at 12:00 PM CT Questions are submitted online No The project work consists of the following major items and approximate quantities: BASE BID: Unclassified Excavation - 6,270 CY, Crushed Aggregate Base Course 8" - 12,750 SY, Crushed Aggregate Base Course 14" -5,980 SY, Asphalt Base Course - 5,710 Tons, Asphalt Surface Course-1,720 Tons, 14" Cement Concrete Pavement - 1,290 SY, 16" Cement Concrete Pavement -9,360 SY, 18" Cement Concrete Pavement - 540 SY, Bituminous Pavement Removal - 8,740 SY, PCC Pavement Removal, 1,580 SY, Storm Sewer 12" to 18"-492 LF, Drainage Structures - 3 EA, Taxiway Edge Lights - 29 EA, Taxiway Guidance Signs - 4 EA, Electric Cable - 4,940 LF, Concrete Encased Duct Bank - 2,650 LF, Pavement Marking - 27,500 SF, Seeding - 1.5 AC, Mulching - 1.5 AC. ADDITIVE ALTERNATE 1: Unclassified Excavation - 2,400 CY, Concrete Encased Duct Bank - 240 LF, Taxiway Edge Lights -6 EA, Crushed Aggregate Base Course 8" - 6,100 SY, Crushed Aggregate Base Course 14" - 1,570 SY, Asphalt Base Course -2,675 Tons, 14" Cement Concrete Pavement-610 SY 16" Cement Concrete Pavement -4,250 SY, Bituminous Pavement Removal - 3,690 SY, PCC Pavement Removal - 580 SY The Disadvantaged Business Enterprise (DBE) goal for the project has been established at 10%.

Bid Results

Transportation Terminals

$4,520,901.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
295
Bidding Soon
3,922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

July 16, 2025

Project location map

60 Airport Dr, Rockford, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.