EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a transportation facility in Rockford, Illinois. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Reference Number 0000387624 Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - FOB Destination - Installation Required - Insurance Required - Local Service Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % A bid bond, cashier's check, or a certified check made payable to the order of the Chicago Rockford International Airport in the amount of ten percent (10%) of the total bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. Question Deadline 06/10/2025 at 12:00 PM CT Questions are submitted online No The project work consists of the following major items and approximate quantities: BASE BID: Unclassified Excavation - 6,270 CY, Crushed Aggregate Base Course 8" - 12,750 SY, Crushed Aggregate Base Course 14" -5,980 SY, Asphalt Base Course - 5,710 Tons, Asphalt Surface Course-1,720 Tons, 14" Cement Concrete Pavement - 1,290 SY, 16" Cement Concrete Pavement -9,360 SY, 18" Cement Concrete Pavement - 540 SY, Bituminous Pavement Removal - 8,740 SY, PCC Pavement Removal, 1,580 SY, Storm Sewer 12" to 18"-492 LF, Drainage Structures - 3 EA, Taxiway Edge Lights - 29 EA, Taxiway Guidance Signs - 4 EA, Electric Cable - 4,940 LF, Concrete Encased Duct Bank - 2,650 LF, Pavement Marking - 27,500 SF, Seeding - 1.5 AC, Mulching - 1.5 AC. ADDITIVE ALTERNATE 1: Unclassified Excavation - 2,400 CY, Concrete Encased Duct Bank - 240 LF, Taxiway Edge Lights -6 EA, Crushed Aggregate Base Course 8" - 6,100 SY, Crushed Aggregate Base Course 14" - 1,570 SY, Asphalt Base Course -2,675 Tons, 14" Cement Concrete Pavement-610 SY 16" Cement Concrete Pavement -4,250 SY, Bituminous Pavement Removal - 3,690 SY, PCC Pavement Removal - 580 SY The Disadvantaged Business Enterprise (DBE) goal for the project has been established at 10%.

GC Bidding

Transportation Terminals

$600,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting, Special Purpose Lighting, Obstruction Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
156
Bidding Soon
2,898
All Active Projects
1,101
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

img_map_placeholder

60 Airport Dr, Rockford, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Construct Group VI Aircraft Pavement Modifications for Taxiway a and for Expand South Cargo Apron

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.