Published April 23, 2025 at 8:00 PM

Updated December 12, 2025

Site work and renovation of a civil project in Sumter, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project Location: Shiloh Treatment Plant at I-95 Rest Area Northbound Between County Rd 43-59 and Hwy 53 in Sumter County, SC Replacement of 2 submersible well pumps (each 15-HP) and associated 3"-diameter column pipe, electrical, and controls; clean 2 existing wells (each 6"-diameter, 300' deep); replacement of well head piping and appurtenances at 2 wells; and replacement of filter media in 3 sand filters. Construction Cost Range: $750,000 to $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project includes the following Work: Base Bid Inspection, cleaning, disinfection, and testing of 2 existing wells (each 6"-diameter, 300' deep); replacement of 2 submersible well pumps (each 15-HP) and associated 3"-diameter column pipe, electrical, and controls; replacement of well head piping and appurtenances at 2 wells; replacement of treatment building raw water pipe and associated valves and appurtenances; replacement of vertical filter influent pipe with new flow meter; replacement of filter media in 3 sand filters; and electrical, mechanical, instruments, and controls. Additive Bid Alternates Repainting of 3 sand filters and replacement of all sand filter piping, valves, and appurtenances; replacement of 2 booster pumps (each 15-HP) and essential suction and discharge piping; add booster pump VFDs and replace booster pump piping and appurtenances in treatment building; replacement of treatment building roof and doors; replacement of chemical feed system and appurtenances; repainting of holding tank; tree removal; and PFAS testing Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Engineer: Davis & Floyd, Inc. John E. Reynolds, PE Senior Project Manager jreynold@davisfloyd.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. A pre-bid conference will not be conducted for this project.

Bid Results

Water / Sewer

$1,315,286.00

Public - County

Renovation, Site Work

33

20

7

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
62
Bidding Soon
1,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 16, 2025

Project location map

Multiple Locations, Sumter, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.