BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work for a civil project in St Charles, Illinois. Completed plans call for site work for a water / sewer project.

Well No. 8 Water Treatment Plant Rehabilitation Any Contract or Contracts Awarded Under This Invitation for Bids Are Expected to Be Funded in Part by a Loan From the Illinois Environmental Protection Agency (Illinois Epa). Neither the State of Illinois Nor Any of Its Departments, Agencies, or Employees is or Will Be a Party to This Invitation for Bids or Any Resulting Contract. The Procurement Will Be Subject to Regulations Contained in the Procedures for Issuing Loans From the Water Pollution Control Loan Program (35iac Part 365) or the Public Water Supply Loan Program (35iac Part 662), the Davis-bacon Act (40 Usc 276a Through 276a-5) as Defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 Ilcs 570), Illinois Works Jobs Program Act (30 Ilcs 559/20-1), and the Federal Aeuroebuild America, Buy America Requirements Contained in the Infrastructure Investment and Jobs Act, Pub L. No. 117-58. A. Demolition 1. Concrete sidewalk and asphalt for raw main trenching. 2. Well No. 8 Water Treatment Plant - floor slab, pipe, filters, softeners, pumps, etc. 3. Well No. 8 Booster Station - exterior wall facade, doors, windows, rood, electrical, HVAC. 4. Well No. 8 - pump, electrical. B. Site Work 1. Site electrical. 2. Paving and restoration. 3. Site raw water piping C. Well No. 8 Rehabilitation 1. Replace electrical controls and panels onsite. 2. Install new well and pitless adapter D. Well No. 8 Water Treatment Plant Rehabilitation 1. Replacement of miscellaneous metals including pipe supports and trench drain grates. 2. Installation of replacement/new process piping, fittings, and valves. 3. Expansion of existing chemical feed systems. 4. Installation of replacement brine pump and piping. 5. Rehabilitation of Ion Exchange Softeners units and replacement of face piping/valves. 6. Rehabilitation of HMO Filter units and replacement of face piping/valves. E. Well No. 8 Booster Station Rehabilitation 1. Construction of brick masonry wall facade. 2. Installation of replacement roofing system. 3. Installation of replacement windows and doors. 4. Installation of replacement HVAC equipment and ductwork. 5. Installation of new electrical equipment. F. Well No. 14 1. Install electrical controls and panel onsite. 2. Install new well pump and pitless adapter. G. Perform Work of Contract under stipulated sum Contract with Owner according to Conditions of Contract Questions received after 3:00PM on Monday, May 12th, 2025 will not be answered as per ADDA 3.

Bid Results

Water / Sewer

$7,799,000.00

Public - City

Site Work

83

27

58

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
249
Bidding Soon
3,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 2, 2025

Project location map

Multiple Locations, St Charles, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.