BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Demolition, site work and new construction of an educational facility in Norwalk, Connecticut. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

Project No: 21016.01 The Work includes construction as indicated on the construction documents. The proposed project is located at 23 Calvin Murphy Drive, Norwalk, Connecticut. The project will consist of a complete demolition of the existing building and the building of a new high school. The new High School is approx. 350,000 sf, consisting of multiple stories. General education classrooms, science rooms, computer science, administrative offices, culinary arts, auditorium, gymnasium, auxiliary gymnasium, natatorium, offices, and supporting lockers and team rooms. Supporting spaces consist of mechanical, electrical, fire protection, and IT rooms; cafeteria, servery and kitchen; building storage and receiving. The structure is composed of concrete footings with aggregate piers and foundation walls, steel columns. The main level floors consist of concrete slabs and upper story floors are structural elevated slabs on metal decking. Exterior storefront windows and curtain wall systems will utilize insulated glazing with thermally broken aluminum frames. The interior wall construction will be a combination of steel stud wall framing with gypsum board and masonry block. Ceilings are mostly suspended acoustical ceiling tile systems. The site will be reconfigured to locate the new school where the existing synthetic turf field is, south of the existing main parking lot. Overall, the new site plan will provide a total of 436 spaces. The existing school will be occupied throughout construction during the regular school year. Construction is scheduled to start around March 2024 and the new high school building is scheduled to be occupied for the school year 2027-2028. The balance of sitework, and new playfields are schedule for completion in Nov. 2028. Questions Due Date: Mar 26th 2025, 5:00 PM EDT

Bid Results

Educational

$264,210.00

Public - City

Demolition, New Construction, Site Work

1091

52

4

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
856
Active Projects
316
Bidding Soon
6,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 5, 2025

Project location map

23 Calvin Murphy Dr, Norwalk, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.