Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 7, 2025 at 8:00 PM
Updated September 19, 2025
Site work for a civil project in Waller, Texas. Completed plans call for site work for a development.
Mass Grading and Detention Pond Improvements for Lakeview Phase 2 Question Deadline 03/31/2025 online submission. Construction stakesfor detention basin will include a lath with corresponding label (location, relevance, cut/fill, etc.) as appropriate and will be provided at the following locations during three (3) site visits: First Visit o Construction stakes for detention basin will include staking the top of bank and ties to the toe of slope. o Stakes are provided for top of banks with a dimension to the toe of slope with a 25 offset (including hub) and a 35 offset for line only. Second Visit o Construction stakes for detention basin will include staking the storm outfalls flowlines and the detention center pilot channel if applicable. o Stakes are provided for the flowlines with corresponding label (location, relevance, cut/fill, etc.) with a 25 offset (including hub) and a 35 line only. o Stakes are provided at the detention center pilot channel with label (location, relevance, etc.) with a 25offset (including hub) and a 35 offset for line only. Third Visit o Construction stakes for detention basin will include staking the storm outfalls slope pavement and extreme event overflow, when applicable. o Staked are provided for the flowlines with corresponding label (location, relevance, etc.) at the concrete structure corner and points of vertical intersection with a 25 offset (including hub) and a 35 offset for line only.
Bid Results
Roads / Highways
$6,828,889.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
To Be Determined, Waller, TX
Related To This Project
Waller, TX
Bid Date: Apr 03 2025
Waller, TX
--
Waller, TX
--
Waller, TX
--
Waller, TX
Bid Date: May 09 2025
Waller, TX
--
Waller, TX
Bid Date: May 21 2025
Waller, TX
Bid Date: Mar 27 2025
Waller, TX
--
Waller, TX
Bid Date: Mar 21 2025
Waller, TX
--
Waller, TX
Bid Date: Mar 13 2025
Waller, TX
--
Waller, TX
Bid Date: Feb 27 2025
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
