EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work and paving for a civil project in College Station, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Bid Package 1.00 - Work procurement packages necessary to complete the requirement of the proposal documents for the City of College Station Wells 10, 11, 12 and Collection Pipeline: The deadline to ask questions is 5/06/2025 2:00 PM CST Bid Package 1.03 (Re-Bid) - ROW Clearing, Grubbing & Temporary Construction Gaps Bid Package 1.04 (Re-Bid) - Well Site Access Road Construction Bid Package #1 - Early work Procurement Packages includes but is not limited to all work, labor, equipment, personnel, and materials necessary to complete the requirements of the proposal documents including ROW Clearing, Grubbing & Temporary Construction Gaps (Bid Package 1.03), Well Site Access Road Construction (Bid Package 1.04). Submit a Bid Bond with the Price Proposal in the amount of five percent (5%) total amount of Bid A Performance and Payment Bond will be required to be submitted to the CMAR by the successful Bidder in accordance with the General and Supplementary Conditions All questions about the meaning or intent of the Contract Documents are to be submitted on the Project website Technical interpretations or clarifications considered necessary by CMAR and Engineer in response to such questions will be issued by Addenda. Questions received less than five (5) days prior to the date for opening of Bids may not be answered Failure to comply with and perform in accordance with these Milestones may result in Liquidated damages as set forth in the Supplementary Conditions, or cancellation of the Contract or Agreement. The CMAR reserves the right to reject any and all proposals, to waive any informalities and technicalities and to accept the proposal most advantageous to the CMAR Team and the City of College Station. Question Deadline 05/08/2025 All questions about the meaning or intent of the Contract Documents are to be submitted on the Project website at https://www.civcastusa.com.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Paving, Site Work

85

19

7

4

Subscribe For Documents

152 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
68
Bidding Soon
2,852
All Active Projects
1,020
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 16, 2025

img_map_placeholder

Multiple Locations, College Station, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.