BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a mixed-use development in Taber, Alberta. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

The main items of Work of this Contract include the following: Schedule 'A' - 45 Avenue Infrastructure Improvements 1. Topsoil stripping, asphalt, concrete and gravel removal, appurtenance adjustment, concrete curb and gutter, asphalt road construction, gravel road construction, topsoil replacement and grass sod. 2. 190m of 200mm water main including connections to existing water mains, isolation valves, hydrants, water services and associated works. 3. 185m of 200mm sanitary main including connection to an existing sanitary manhole and mains, precast concrete manholes, sanitary services and associated works. 4. 4,700 m2 of surface restoration from property line to property line including concrete, asphalt, and grass. Schedule 'B' - 51 Street Storm Main Extension 1. Topsoil and sod removal, catch basin and storm main installation, appurtenance adjustment, concrete curb, gutter and swale replacement, asphalt road construction, topsoil replacement and grass sod. 2. 75m of 250mm storm main including a connection to the existing catch basin, and the installation of two new catch basins. 3. 250 m2 of surface restoration including concrete, asphalt and grass. Schedule 'C' - 54 Street Water Main Replacement 1. Asphalt removal. 2. 100m of 150mm water main including connections to existing water mains, isolation valves, and associated works. 3. 500 m2 of asphalt surface restoration. Schedule 'D' - Sunrise Estates Storm Upgrade 1. Topsoil and sod removal, catch basin and storm main installation, concrete curb, gutter and swale replacement, asphalt road construction, topsoil replacement and grass sod. 2. 70m of 250mm storm main including a connection to the existing catch basin, and the installation of three new catch basins. 3. 250 m2 of surface restoration including concrete, asphalt and grass. The Site of the Work of this Contract is located in Taber, AB. Documents can be obtained from https://taber.bidsandtenders.ca/

Award

Roads / Highways

$1,572,025.00

Public - City

Site Work

18

7

8

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

June 1, 2025

Project location map

Multiple Locations, Taber, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.