Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Site work, paving and new construction of a bridge / tunnel in Traverse City, Michigan. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
UPDATE :Primary project: Necessary repairs to N Union Street Bridge due to severely corroded beam ends. Including preservation work. The project involves essential repairs to severely corroded beam ends, cleaning and coating all steel beams to prevent further degradation, and replacing the faulty expansion joint in the middle of the bridge. Enhanced project: Replacement of decking and railing adjacent to bridge (northwest corner of bridge) and under bridge lighting. Note: Should the enhanced project not move forward, the primary project with the parking lot will be revised to remove the enhanced portion and be completed as described. Project is in City of Traverse City capital budget fy 2025-2031 CIP ____________________________________________________________________ Weight Restrictions Put on North Union Street Bridge New weight restrictions are in place for heavy vehicle and commercial truck operators on Traverse City's North Union Street Bridge due to corrosion on some of the bridge's steel beams. The city hopes to repair the bridge in the near future and is working to line up funding for the project. According to the city's Bay Brief, a "recent special inspection of the bridge found corrosion that limits the load capacity of some of the steel beams. Using the findings of the inspection a load rating analysis was conducted, confirming that the bridge must be posted with weight restrictions. The weight limits are intended to prevent loads that cause stresses in the affected beams above the safe limit from crossing the bridge." The weight restrictions will be posted by truck type using a standard sign type at both ends of the bridge as well as ahead of the bridge starting this month. The weight restrictions are as follows: 1-unit truck (e.g., concrete truck) - Maximum allowable weight: 31 tons 2-unit truck (e.g., semi-trailer truck) - Maximum allowable weight: 32 tons 3-unit truck (e.g., semi-trailer truck with an additional trailer) - Maximum allowable weight: 41 tons The restrictions are in place to prevent damage to the load-restricted beams until repairs can be completed. For reference, a 2023 Subaru Outback base model reportedly weighs 1.8 tons and a 2024 Cadillac Escalade reportedly weighs 2.9 tons. One ton is 2,000 pounds. The city has already repaired six of its seven vehicle bridges since 2021, including the South Cass Street Bridge, the Eighth Street Bridge, the Park Street Bridge, the West Front Street Bridge (complete new bridge), the South Union Street Bridge, and the North Cass Street Bridge. Approximately $13.3 million was invested in bridge projects between 2021 and 2023. The city has North Union Street Bridge repairs listed in its capital improvement plan for fiscal year 2025-26 and is working to secure project funding.
Conceptual
Bridges / Tunnels
$600,000.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
N Union St, Traverse City, MI
Related To This Project
Traverse City, MI
--
Traverse City, MI
Bid Date: Jul 01 2025
Traverse City, MI
Bid Date: Jun 27 2025
Traverse City, MI
Bid Date: Jun 27 2025
Traverse City, MI
Bid Date: Jul 23 2025
Traverse City, MI
Bid Date: Jul 25 2025
Traverse City, MI
--
Traverse City, MI
--
Traverse City, MI
--
Traverse City, MI
--
Traverse City, MI
--
Traverse City, MI
--
Traverse City, MI
--
Traverse City, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.