BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated April 1, 2025

Site work for a playground / park / athletic field in Ramer, Tennessee. Completed plans call for site work for a playground / park / athletic field.

Ramer Elementary School Playground Fencing Project Ramer Elementary School is accepting sealed bids for the installation offencing as specified below. For any questions or further clarification, please contact Dr. Sondra Kiser or Mr. Stacy Suggs at 731-645-3996. Please note: The school office will be closed for Spring Break from March 24th to March 28th. If delivering a bid in person, please do so before or after these dates. PROJECT SPECIFICATIONS:455 feet of 6-foot-tall black 8-gauge chain link fencing with slats218 feet of 6-foot-tall black 8-gauge chain link fencing without slats3-inch Schedule 20 corner posts2 3/8-inch Schedule 20 line posts1 5/8-inch top rail, Schedule 20One (1) 4-foot walk gate One (1) 12-foot double gate Black tension wire installed around the entire fenced area The school reserves the right to accept or reject any or all bids.Thank you for your interest in this project. We look forward to your bid submission.

Post-Bid

Playgrounds / Parks / Athletic Fields

$60,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
69
Bidding Soon
523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 30, 2025

Project location map

4173 TN-57, Ramer, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.