BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Renovation of a military facility in Pendleton, Oregon. Completed plans call for the renovation of a military facility.

PROJECT DESCRIPTION: The project includes but is not limited to the removal of the existing direct-fired natural gas rooftop make-up-air unit and replace with a standard efficiency packaged gas heating and DX cooling rooftop unit with return air that serves the drill area per Attachment B Technical Specifications and Attachment C Plans and Drawings. All removed material shall be salvaged to Owner The following range is a project estimate for bonding purposes only: $95,000 to $120,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT COMPLETION DATES: PROJECT START DATE: 15 calendar days from issuance of Notice to Proceed. SUBSTANTIAL COMPLETION: 210 calendar days from issuance of Notice to Proceed FINAL COMPLETION: 240 calendar days from issuance of Notice to Proceed Failure to complete the Project known as Pendelton Armory HVAC Upgrade Project by the Substantial Completion date indicated in Section 3 of this agreement will result in damage to the State of Oregon. As a result, the Contractor shall provide and maintain, at no cost to the State, commercial grade temporary heating and cooling sufficient in size and capabilities for the Pendleton Armory as detailed in Attachment B Technical Specifications and Attachment C Plans and Drawings and any residual requirements directly related to the HVAC system being inoperable. The Contractor shall provide this service for each calendar day in excess of the Substantial Completion Date until the Project is 100% complete and accepted by the Owner. The single Point of Contact “POC” for all questions regarding the ITB, forms, Specifications, Plans, bidding process, changes, clarifications, requests for brand approval, substitution requests, the award process, protests and any other issues that may arise is Name: Sam Goff – CPPB Address: Oregon Military Department AGI Support Branch 3406 Cherry Ave NE Keizer OR 97303 Phone: 971-355-4167 E-mail: sam.a.goff@omd.oregon.com

Award

Military

$115,167.00

Public - Federal

Renovation

22

6

4

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
16
Bidding Soon
271
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 25, 2025

Project location map

2100 NW 56th Dr, Pendleton, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.