EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Bethel Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

Project is generally described as: Material and labor for 48" Diameter CMP stormwater Pipe under Tree line Avenue to be installed by Jack and Bore Method, including pipe, headwalls, bypass pump waterline, pump dissipater rip rap , coffer dam, rock filter, filter bag. All materials shall be PennDOT Pub 408 Tree Line Avenue Pipe Replacement - Jack and Bore Project, 3015 S. Pine Grove Street, Fredericksburg,, Pa 17026 Question Deadline 04/03/2025 at 4:00 PM ET Location online portal. The successful bidder must supply to the Township within 20 days of the award of the contract a performance bond in the amount of 100% of the contract amount. Each proposal must be accompanied by a bid bond payable to Bethel Township in an amount of 10% of the bid total. The Township Reserves the Right to Accept or Reject Any and/or All Bids. The work in connection with this project falls under the Pennsylvania Prevailing Wage Act.

GC Bidding

Water / Sewer

$100,000.00

Public - City

Site Work

11

5

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
131
Bidding Soon
1,826
All Active Projects
834
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

img_map_placeholder

Tree Line Ave, Bethel Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bethel Township Tree Line Avenue Pipe Replacement - Jack and Bore

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.