BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2025 at 7:00 PM

Updated December 17, 2025

Site work and renovation of a civil project in San Francisco, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of 5/6/2025, owner has determined the pre-qualified design builders. REVISE subparagraph 1.03A, Question Due to read as follows: "Questions Due (deadline for submission of written questions/ Requests for Clarifications/ Requests for Changes to the Terms & Conditions of the Agreement) - October 3, 2025, 2:00 PM" The San Francisco Public Utilities Commission (SFPUC) is issuing this Request for Qualifications (RFQ) in search of Applicants with the specified qualifications to respond to the forthcoming Request for Proposals (RFP) to design and construct the DB-141 Southeast Water Pollution Control Plant Nutrient Reduction project (Project). An "Applicant" is any entity responding to this RFQ. The Southeast Treatment Plant (SEP) is the centrepiece of SFPUC's wastewater treatment operations. Built in 1952, SEP is San Francisco's largest wastewater facility with a treatment capacity rated for 85.4 MGD designed average dry weather flow (ADWF) and 250 MGD of designed peak wet weather flow (PWWF). The SEP is the main treatment plant for the city, handling about 80% of the wastewater and storm water from the eastern two-thirds of San Francisco. Treated effluent in dry weather from the SEP is discharged via the Pier 80 Outfall into Lower San Francisco Bay under National Pollutant Discharge Elimination System (NPDES) No. CA0037664. In wet weather secondary treated effluent from the SEP is discharged to Quint Street Outfall up to 140 million gallons per day (MGD) and primary treated effluent up to 110 MGD from SEP is discharged to Pier 80 Outfall. In July 2024, the San Francisco Bay Regional Water Quality Control Board (RWQCB) adopted the Nutrient Watershed Permit (Watershed Permit) (CA0038873) that reduces the amount of nutrients, specifically total inorganic nitrogen, discharged from the Southeast Treatment Plan (SEP) into San Francisco Bay. The permit includes two effluent limits on the average seasonal discharges from the SEP that occur between May 1 and September 30: (1) "Interim" limit effective upon permit adoption of 11,000 kilograms (kg) of total inorganic nitrogen (TIN) as nitrogen (N) per day; and (2) "Final" limit effective October 1, 2034 of 3,300 kg-N/day as SFPUC's current allocation in a Bay-wide load limit allocated to the 37 dischargers. The "final" effluent limits will only be effective if the Buyside Aggregate Mass Load Limit of 26,700 kg-N/day is exceeded. To address the Watershed Permit requirements, SFPUC is embarking on the Nutrient Reduction Project (Project). Based on a preliminary conceptual evaluation, the proposed Project assumes maximization of the use of existing infrastructure to reduce costs. This baseline concept for the Project has an escalated, total project cost of $1,470,000,000 and is included in the 10-year capital planning process. It assumes a scope of work comprising: o Retrofit and/or replacement of the existing high-purity oxygen (HPO) activated sludge system to produce densified activated sludge; o Construction of a new biological nutrient removal (BNR) system; and o Modification of existing aeration basins (Facility 200). This baseline concept is subject to an alternative analysis that will select a variant and configuration of nutrient treatment that achieves maximum return on investments and benefits to SFPUC stakeholders. Specifically, the selected nutrient treatment strategy must: o Reliably meet or exceed the environmental and permitting compliance requirements in the Watershed Permit; o Be constructible within the existing SEP site without disrupting ongoing plant operations and maintenance (O&M); and o Have attained technology maturity and demonstrated successful operation at similar facilities. The size, scale and complexities of the Project represents a significant effort to deliver in the timeframe required. Following a series of consensus-building workshops with key stakeholders, it was determined that PDB represents the most advantageous method for delivering the Project to achieve the following objectives most desired by key stakeholders: o Maintaining operational continuity; o Optimizing lifecycle cost; o Enabling flexibility in design changes; o Maximizing innovation and value engineering; o Facilitating early environmental review and risk mitigation; o Achieving early cost and schedule certainty; and o Allowing early contractor involvement. All requests for information concerning the RFQ must be directed to qbd@sfwater.org no later than the Deadline for Applicants to Submit RFQ Questions. NTP to SC - 4485 CDs; SC to FC - 365 CDs

Post-Bid

Water / Sewer

$600,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
42
Bidding Soon
2,131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2025

May 4, 2026

Project location map

750 Phelps St, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.