BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work for an educational facility in Stockton, California. Completed plans call for site work for a educational facility.

Contractors to provide all labor, materials, equipment, and services necessary to install all fencing on this project. New installation Approx. 50' Linear Feet of 7ft high black ornamental fence Ameristar Iron Montage 11 -2R classic fence. (Equal to or better). (2) single swing man gates to be installed. 4' x 7' gates with closures with panic hardware (Von Duprin Exit Device CD9847NL-US26D-3'-697-SNB). Add expanded metal on and around gate to prevent entry from the outside. New installation Approx. 350 Linear Feet of T High Galvanized fence with 1"x9 gauge fabric. (2) single swing man gates to be installed 4' x T gates with closures and panic hardware. (3) double swing gate to be installed (1 6', 1 O',8') x 7'. Provide 12" mow strip for all galvanized fencing, Demo of approx. 100 Linear feet of existing fence and poles. Demo approx. 100 linear feet of fabric and dispose of. Sleeve existing poles and install approximately 100 Linear feet of 7' High Galvanized fence with 1 'jx9 gauge fabric. Provide 1 2" mow strip for all galvanized fencing. Contractor to haul away demoed materials. Demo and haul off approximately 75 square feet of concrete around existing drain. Raise drain to create clear path of travel. Pour back and finish concrete. Re-route and underground waterline between portables and patch back. All measurements to be verified by the contractor prior to installation. The contractor is responsible for having the area USA prior to installation. Contractor to locate/GPR prior to removal of existing fence. All man gates to be no smaller than 4 feet opening for ADA. Terminal Posts to be 2 7/8"or bigger. Line posts to be 2 3/8" or bigger. Top Rail 1 5/8" 7 ga bottom wire Gate hinges shall be bulldog hinges so they can swing in both directions. All posts to be a minimum of 36" deep. Installers are responsible for keeping site secure with fence panels (If necessary) Construction Schedule based on 40-hour week. All Fencing and concrete work to be completed before July 25, 2025. Clean area and complete final inspection. Provide Manufacturer's warranty and 1 year tabor warranty. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors license: Cl 3 The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. A bid bond by an admitted surety insurer on the form provided by the District a cashier's check or a certified check, drawn to the order of the Lodi Unified School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid.

Award

Educational

$181,170.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
16
Bidding Soon
1,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

9434 Thornton Rd, Stockton, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.