BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a road / highway in LaFayette, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Walker County Government is now accepting sealed bids to resurface multiple roads in 2025 & 2026. The work involves roughly 70 miles of patching, asphalt overlay with tack coat, leveling and striping along approximately 80 county roads. Question Deadline 04/04/2025 at 9:00 AM ET Send inquiries regarding this project and the bidding process by email to: j.legge@walkerga.us _ Contractor is advised that traffic will have to be maintained at all times. Contractor will be required to submit a traffic control plan to show how traffic will be maintained if awarded the contract. Summary - Scope of Work _ Patching, binder overlay, asphalt overlay with tack coat, leveling and striping according to the proposal form item page for 70.57 miles of roads in unincorporated Walker County. _ Provide perimeter security and erosion control measures throughout the duration of the project in accordance with permits. Comply with federal, state and local regulations. _ Provide minimum one (1) year warranty on material & workmanship. _ The project must start by July 1, 2025. 40% of the project must be completed by December 31, 2025 and 100% of the project must be completed no later than September 30, 2026, unless the parties agree to an extension of time. Quality Assurance Requirements _ Traffic Control: Ensure warning signs are in place in accordance with "The Manual on Uniform Traffic Control Devices (MUTCD) and the specifications that control the project. Check for trained flag-persons and determine if a pilot vehicle is required. Place any traffic control device that may be necessary to warn the public about the construction zone. Portable Advance Warning Signs are fine. _ Project Safety: The contractor is solely responsible for maintaining a safe work environment for the duration of the project. _ Acceptance Testing: Ensure compliance with all applicable GDOT specifications; submit required delivery tickets, material samples, and other submittals as required by contract. Random testing of workmanship and materials may be conducted at the owner's discretion. _ The Contractor shall be responsible for taking corrective action for any notices of violations issued as a result of the Contractors or all subcontractors' actions or performances during this scope of work. Environmental Controls _ Comply with federal, state and local regulations pertaining to water, air, solid waste, recycling, chemical waste, sanitary waste, sediment and noise pollution. _ Protection of Natural Resources: Preserve the natural resources within the project boundaries or restore to an equivalent condition. _ Temporary Construction: Remove indications of temporary construction facilities, such as haul roads, work areas, structures, stockpiles or waste areas. _ Water Resources: Comply with applicable regulations concerning the direct or indirect discharge of pollutants to underground and natural surface waters. _ Oily Substances: Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water in such quantities as to affect normal use, aesthetics, or produce a measurable ecological impact on the area. _ Store and service construction equipment at areas designated for collection of oil wastes. _ Dust Control, Air Pollution, and Odor Control: Prevent creation of dust, air pollution and odors. _ Use temporary enclosures and other appropriate methods to limit dust and dirt rising and scattering in air to the lowest practical level. _ Store volatile liquids, including fuels and solvents, in closed containers. _ Properly maintain equipment to reduce gaseous pollutant emissions. _ Noise Control: Perform demolition operations to minimize noise. _ Repetitive, high level impact noise will be permitted only between the hours of 7:00 a.m. and 8:00 p.m. Aside from this, there are no work hour restrictions.

Award

Roads / Highways

$1,786,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
112
Bidding Soon
1,558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

July 1, 2025

Project location map

Multiple Locations, LaFayette, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.