Site work, paving and new construction of a mixed-use development in Binghamton, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the construction of a pre-engineered storage facility; road / highway; and water / sewer project.

Operations and Maintenance Building Phase 2A This project will proceed under multiple prime contracts, consisting of: Contract 05 - Site Work (SC) All Requests for Information (RFI) must be received no later than 12:00 noon on Tuesday, March 24, 2025. Any RFI received after this time will receive no response. All Inquiries to: Attn: Michael DeCarlo LaBella Associates, P.C. 316 S. Clinton St., 2nd Floor Syracuse, New York 13202 (585) 402-7021 mdecarlo@labellapc.com Bid Proposals received after, will be returned to the bidder unopened. PROJECT DESCRIPTION The work involves construction of a new pre-engineered metal building for BT BOCES operations and maintenance. The trades included are general construction, plumbing, mechanical, electrical and site. The rooms included are an open office, auto mechanic office, storage, receiving dock, vehicle repair, staff and bus driver breakrooms, 4 toilet rooms, mechanical room and compressor room. Site work includes gravel parking. driveway, bus parking loading dock, and storm water management. The date of commencement of the Work shall be THE NOTICE TO PROCEED. The Contractor shall achieve Substantial Completion of the entire Work not later than September 29, 2025. Document info : Contact Syracuse Blueprint in advance for pick-up, or to provide shipping account information for expedited delivery. Bidders wishing sets of Plans and Specifications to be mailed to them shall include, in addition to the document deposit, a non-refundable check in the amount of Thirty-Five Dollars ($35.00) per set for handling and postage, sent and made payable to Syracuse Blueprint Company. 825 E Genesee St., Syracuse, NY 13210. A Bidder, making the deposit required for the Bidding Documents, submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids and if the copy of the plans and specifications used by such Bidder, other than the successful Bidder is returned in good condition within thirty (30) days to Syracuse Blueprint Company (address above) award of the contract covered by such plans and specifications, or rejection of the Bid, the full amount of such deposit for one copy of the plans and specifications shall be returned to such Bidder, including the successful Bidder. Partial reimbursement, in an amount equal to the full amount of such deposit for one set of plans and specifications per unsuccessful bidder or non-bidder less the actual cost of reproduction of the plans and specifications, shall be made for the return of all other copies of the plans and specifications in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. The OWNER hereby reserves the right to waive any informality and reject any or all bids or to accept the one that, in its judgment, will be in the best interest of the OWNER. A Bid Security in the amount of five percent (5%) of the Bid must accompany the bid in accordance with the Instructions to Bidders. A Bidder, making the deposit required for the Bidding Documents, submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids and if the copy of the plans and specifications used by such Bidder, other than the successful Bidder is returned in good condition within thirty (30) days to Syracuse Blueprint Company (address above) award of the contract covered by such plans and specifications, or rejection of the Bid, the full amount of such deposit for one copy of the plans and specifications shall be returned to such Bidder, including the successful Bidder. Partial reimbursement, in an amount equal to the full amount of such deposit for one set of plans and specifications per unsuccessful bidder or non-bidder less the actual cost of reproduction of the plans and specifications, shall be made for the return of all other copies of the plans and specifications in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$250,000.00

Public - County

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Stationary Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Specialty Casework, Laboratory Casework, Countertops, Furnishings and Accessories, Bedroom Furnishings, Blankets, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes, Trash Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, Flexible Connectors, HVAC Fans, HVAC Power Ventilators, Air Outlets and Inlets, Central Heating Equipment, Furnaces, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
75
Bidding Soon
957
All Active Projects
475
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

img_map_placeholder

435 Glenwood Rd, Binghamton, NY

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Operations and Maintenance Building Phase 2A Contract 05 - Site Work (SC)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.