BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work for a water / sewer project in Milton, Ontario. Completed plans call for site work for a water / sewer project.

Conservation Halton is interested in contracting for the following works: Full replacement of approx. 1040m of snowmaking pipe - 520m water distribution and 520m of compressed air, adding roughly 160m of new pipe install (80m water, 80m compressed air). The installation and welding of 2-inch FNPT nipples for hydrants at 34 designated locations along the pipelines. Documents can be obtained at: https://conservationhalton.bidsandtenders.ca Question Deadline: Tue Apr 1, 2025 2:00:00 PM (EDT)

Award

Water / Sewer

$500,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
187
Bidding Soon
5,136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

Multiple Locations, Milton, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.