BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work, paving and new construction of a mixed-use development in Houston, Texas. Conceptual plans call for the construction of a bridge / tunnel; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Plans call for about 8,500 LF of 10'-0" new trail at the Halls Bayou Detention Basin along with sidewalk improvements, construction of 2 parking lots/driveways, 3 pedestrian bridges spanning between 141' to 162', retaining walls, removal/relocation of utilities. As of March 19, 2025, this project is in the process of getting approvals. An engineer has been selected. Information regarding how and when a general contractor will be selected has not yet been confirmed. Construction is estimated to begin August 2025.

Conceptual

Roads / Highways

$4,850,000.00

Public - County

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
4
Bidding Soon
2,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.