Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Iowa City, Iowa. Completed plans call for the renovation of a 75,000-square-foot, two-story above grade educational facility.

Madison Street Services Building - Renovate Western Half General Description of Work: 1) Project consists of a remodel of the Madison Street Services Western Half and Old Carpentry Shop. New work includes selective demolition, new partitions and doors and associated work. 2) MEPT includes power, data, lighting and A/V required to support new layout. HVAC modifications to existing system and associated work. 3) Alternates: None 4) Allowances: None 5) Unit Prices: None e. Work by Owner: 1) Furniture 2) A/V Equipment 3) Key Cabinet 4) Final Keying 5) Testing and Balancing f. Work Sequence: The work shall be phased as follows: Work Sequence: The work shall be phased as follows: 1) Phase I – North Offices: June 2, 2025 – October 3, 2025 2) Phase II – New Landscape Shop: August 18, 2025 – November 24, 2025 3) Phase III – Carpentry Shop and Suite 180/180A: January 5, 2026 – April 17, 2026 4) Substantial Completion – April 17, 2026 g. Constructor Supervision and Coordination Staffing 1) Constructor shall be represented by a competent full-time Superintendent with no other assigned duties or responsibilities from the commencement of Work until the project achieves substantial completion. The Superintendent for the Constructor shall exercise general supervision over all subcontractors of any tier and shall have decision-making authority of the Constructor. Instructions: On construction contracts competitively bid for which a participation goal is indicated, each Bidder, who is not a Targeted Small Business, shall submit this completed Targeted Small Business Participation Form with their bid. Only those businesses appearing in the Certified TSB Online Directory shall be used to meet the Targeted Small Business participation goal specified in the Project Requirements.

GC Bidding

Educational

$1,300,000.00

Public - State/Provincial

Renovation

54

23

2

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Wall and Door Protection, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Communications Services, Identification for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping, Combustion System Gas Piping, Combustion Air Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Dies and Molds, Molds, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
42
Bidding Soon
566
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 2, 2025

img_map_placeholder

640 S Madison St, Iowa City, IA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Madison Street Services Building - Renovate Western Half

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.