Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2025 at 8:00 PM
Updated December 2, 2025
Demolition, site work, paving, renovation and addition to a mixed-use development in West Tisbury, Massachusetts. Completed plans call for the addition of a 15,000-square-foot, one-story above grade transportation facility; for the demolition of a transportation facility; for the renovation of a 5,000-square-foot transportation facility; for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.
**As of August 11th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The airport seeks to renovate portions of the existing terminal (approximately 5,000 sf.) and construct (approximately 15,000 sf), addition to the Terminal. This project will address deficiency within the existing building to include but not be limited to construction of a new secured (post TSA screening) waiting area for passengers who are awaiting departing aircraft, constructing a new TSA passenger queuing and screening area, construction of new arrivals hall, and baggage claim area. Relocation and Improvements to the checked baggage inspection area, new rental car area, new ticketing counters, new HVAC systems, new electrical and electrical service, new standby generator, fire suppression system, low voltage access control, security cameras and public address systems, and other work. Building construction includes a single-story addition totaling approximately 15,000 sf. Work includes concrete foundation, slab on grade, framing, water proofing, aluminum glazed openings, asphalt shingle pitched roofing and cedar wood shingles. Sitework includes utilities, paving, sidewalk, parking lot lighting, landscaping, and other work. Question Deadline 05/30/2025 at 12:00 PM ET Questions: All questions should be emailed to Annalisa Lewis at alewis@chasolutions.com and Prajakta Patil at ppatil@chasolutions.com Bid Results MASONRY WORK Folan Waterproofing 165900 MISCELLANEOUS AND ORNAMENTAL IRON L & L Contracting Inc 573200 WATERPROOFING DAMPPROOFING CAULKING Folan Waterproofing 554700 ROOFING AND FLASHING Capeway Roofing Systems Inc 723500 GLASS AND GLAZING Greenfield Glass 80000 TILE GVW INC 76435 ACOUSTICAL TILE GVW INC 422064 RESILIENT FLOORS Capital Carpet & Flooring Specialists Inc. 39457 TERRAZZO DePaoli Mosaic 274700 PAINTING John W. Egan Co. Inc 136500 FIRE PROTECTION Carlysle Engineering Inc. 579200 PLUMBING Harborview Plumbing LLC, 479500 HVAC Harold Brothers 3878600 ELECTRICAL American Electrical Construction Inc 4773000
Bid Results
Transportation Terminals
$12,756,756.00
Public - County
Addition, Demolition, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2025
August 13, 2025
71 Airport Rd, West Tisbury, MA
Related To This Project
West Tisbury, MA
Bid Date: Apr 10 2025
West Tisbury, MA
Bid Date: Apr 10 2025
West Tisbury, MA
Bid Date: May 14 2025
West Tisbury, MA
Bid Date: Jun 11 2025
West Tisbury, MA
Bid Date: Jun 09 2025
West Tisbury, MA
Bid Date: Jun 09 2025
West Tisbury, MA
Bid Date: Jun 09 2025
West Tisbury, MA
Bid Date: Jun 11 2025
West Tisbury, MA
Bid Date: Apr 10 2025
West Tisbury, MA
Bid Date: Apr 10 2025
West Tisbury, MA
Bid Date: Mar 13 2025
West Tisbury, MA
Bid Date: Apr 10 2025
West Tisbury, MA
--
West Tisbury, MA
Bid Date: Mar 03 2025
West Tisbury, MA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
