BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and new construction of a clubhouse / community center in Fort Meade, Florida. Completed plans call for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.

The Work consists of, but is not limited to: selective sitework, bituminous asphalt and concrete paving, concrete, standard framing, roofing, doors and frames, kitchen mechanical connections, miscellaneous carpentry, interior finishes, exterior finishes, electrical, mechanical, and plumbing. The design and construction of the Community Center Building should include, at a minimum, the proposed facilities shown on the feasibility and design conceptual floorplans and renderings developed by the Lunz Group Architects. It is understood the design build team will submit a proposed design which at a minimum will contain the following facilities: o A covered main entrance o A multipurpose room with direct access to the outside, o A library with a computer lab. The library will have direct access to the outside, o A library office, o A kitchen, o Separate men's and women's rest rooms o Separate unisex handicapped accessible rest room, o A mechanical room, o An emergency electrical generator with sufficient capacity to provide power for the entire building, o A janitor's closet, o A storage room, o A carrier counseling office, o Sufficient on-site parking to meet the local building and zoning code, and o All mechanicals, including electrical, plumbing, HVAC, ventilation, fire suppression, natural gas, and telecommunications. Deadline for Question Submittal: April 23, 2025 Proposals to design and build a new Multi-Purpose Community Center building on the property located at the southwest corner of Broadway Street East and Washington Avenue, Fort Meade, Florida. The City of Fort Meade is seeking a team, the Design-Build Team, to design and construct the building, parking, and necessary infrastructure. The City of Fort Meade intends to issue one contract to the selected Design-Build Team for the entire scope of work. Proposals from prospective design build firms shall provide qualifications demonstrating their capacity to implement the proposed project and provide a complete Community Center Building with all required appurtenances at no additional cost to the City of Fort Meade. The City Commission of Fort Meade, Florida reserves the right to reject any or all proposals, to waive any minor informalities or minor irregularities in the proposal process, all things being considered equal.

Award

Clubhouse / Community Centers

$3,586,508.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
157
Bidding Soon
2,568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

September 19, 2025

Project location map

Washington Ave & E Broadway St, Fort Meade, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.