Published March 26, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a transportation facility in Williamson, West Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The work to be bid upon is generally described as follows: Contract No. 1 - Rehabilitate Runway, Apron, and Taxiway The scope of the project is to rehabilitate the existing asphalt surface of Runway 8-26, Taxiways A, A1, A2, C, and Main Apron at the Southern West Virginia Regional Airport located outside Varney, West Virginia. The rehabilitation for the Base Bid, Additive Alternate No. 2, and Additive Alternate No. 3 shall consist of removing the existing pavement markings, as necessary, cleaning the surface of deleterious material, repairing existing cracks and joints by placing a hot poured crack and joint sealing filter, and then applying new pavement markings. The rehabilitation for Additive alternate No. 1 shall consists of milling the top 2" of asphalt, performing a full depth repair on any areas that still have visible cracks after milling, placing a new 2" surface course layer of asphalt, and then applying new pavement markings. The Base Bid shall consist of the rehabilitation of Runway 8-26, Additive Alternate No. 1 shall consist of the rehabilitation of the Taxiway A1, Additive Alternate No. 2 shall consist of the rehabilitation of the Taxiways A, A2, and C, and Additive Alternate No. 3 shall consist of the rehabilitation of the main apron. Construction Time Limits - The Contractor will be required to achieve Substantial Completion within 120 calendar days and final completion and readiness for final payment within 150 calendar days of the effective date of the Notice to Proceed. Liquidated damages will be $400.00 per day for each day after the expiration of the construction time. Bids shall be accompanied by a certified check or bid bond payable to the Mingo County Airport Authority, Williamson, West Virginia, in an amount not less than five percent (5%) of the total amount of the Base Bid and Additive Alternates. This project, due to the amount of federal participation, requires the Contractor to meet a goal for Disadvantaged Business Enterprise participation of 4.1 percent (4.1%). The Contractor will be required to justify the amount of DBE participation which will be utilized or that there was a good faith effort made to allow for DBE participation. It is the policy of the Authority that DBE's, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in the performance of contracts assisted in whole or part by funds granted by the DOT. The Mingo County Airport Authority reserves the right to reject any and all bids. Question Deadline 04/09/2025

GC Bidding

Transportation Terminals

$800,000.00

Public - County

Paving, Site Work

13

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
25
Bidding Soon
333
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

img_map_placeholder

176 Airport Rd, Williamson, WV


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rehabilitate Runway, Apron, and Taxiway Contract No. 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.