Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 7, 2025 at 8:00 PM
Updated July 8, 2025
Renovation of a fire / police facility in Charlotte, North Carolina. Completed plans call for the renovation of a fire / police facility.
a. Work to be phased to allow the conOnued operaOon of the facility during all construction phases. b. Remove and dispose of the existing AHU-4 DOAS air handling unit. c. Remove and dispose of the existing outdoor air intake penthouse PH-3. d. Remove and dispose of the existing gas fired domesOc water heater. e. Remove and dispose of the existing roof mounted exhaust fans serving the exercise room and adjacent locker rooms. Three fans in total: EF-6, EF-6, EF-7. ExisOng roof openings from demolished exhaust fans must be curb-capped and insulated. f. Install new AHU-4DOAS air handler to serve the exisOng exercise and locker areas. g. Install new ERV-1 energy recovery venOlator to precondiOon outdoor air using combined airflows from exisOng lockers and exercise rooms for which exisOng exhaust fans are demolished. h. Install new Heat-Pump water heaters on new concrete equipment pad in the exisOng boiler room. i. Controls must be compaOble with the newly installed Carrier Controls System. Work must be performed by the City of Charlotte's authorized sole source controls contractor, Carolina Building Controls to avoid and conflicts with the systems warrant. j. Replace hot water and chilled water pipe installaOon within the scope of work areas for any piping impacted by the current scope of work. Deadline to submit Questions Mar 27th 2025, 4:00 PM EDT This work includes the provision of all labor, material, equipment, supervision, and administration to integrate the work outlined in these specifications into the total building system such that no leakage into the system occurs. A 5% bid security is required with each bid that equals or exceeds $300,000. Bid security shall be submitted in accordance with article 4.2 BID SECURITY of SECTION 00 20 00 - INSTRUCTIONS TO BIDDERS. The estimated cost of this Project is $250,000- $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MWBE = 7%
Award
Fire / Police
$301,641.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
July 7, 2025
4150 Wilkinson Blvd, Charlotte, NC
Related To This Project
Charlotte, NC
Bid Date: Mar 28 2025
Charlotte, NC
Bid Date: Apr 16 2025
Charlotte, NC
Bid Date: Apr 16 2025
Charlotte, NC
Bid Date: Mar 21 2025
Charlotte, NC
--
Charlotte, NC
Bid Date: Apr 10 2025
Charlotte, NC
Bid Date: Apr 10 2025
Charlotte, NC
Bid Date: Apr 22 2025
Charlotte, NC
Bid Date: Jan 21 2021
Charlotte, NC
Bid Date: Apr 10 2025
Charlotte, NC
Bid Date: Apr 14 2025
Charlotte, NC
Bid Date: Mar 27 2025
Charlotte, NC
--
Charlotte, NC
--
Charlotte, NC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
