BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Renovation of an educational facility in Saint Ansgar, Iowa. Completed plans call for the renovation of a educational facility.

The work for the project shall be accomplished under a Single Construction Contract and there will be a Single Bid to include all of the following: 1. General Construction. 2. Mechanical Construction, including: Plumbing, Heating, Ventilating, and Air Conditioning. 3. Electrical Construction, including: Power, Lighting, Communication, and Fire Safety. Doc Note - All bids shall be made on the printed forms attached to and made a part of the proposed Contract Documents. The proposed Contract Documents including the Drawings, and the Project Manual, pursuant to which the work must be done, will be on file and may be viewed after Wednesday, March 19, 2025, at the Superintendent's Office, St. Ansgar Community School, 206 East 8th Street, St. Ansgar, IA 50472. Copies, thereof, are also on file at the Office of the Architect, Atura Architecture, 912 North 13 th Street, Clear Lake, IA. These Documents may be obtained after the aforementioned date by Prime Contractors upon request to the Architect and on the condition they be returned after the receipt of bids. There will be no Contract Document deposit. On-site mobilization and construction shall begin no sooner than May 27, 2025. The actual onsite starting date may vary depending on the established last day of school instruction for the 2024-2025 school year. The Owner requires substantial completion for the project by December 12, 2025 (dependent upon material delivery lead times). Each Bid shall be accompanied by Bid Security, in a separate sealed envelope, in the form of either (1) cash, cashiers check or certified check or certified share draft drawing on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to at least Five (5%) Percent of Project Bid Amount or (2) a Bid Bond executed by a corporation authorized to contract as a surety in the State of Iowa with the amount or penal sum of not less than Five (5%) Percent of Project Bid Amount. The Board of Education of the St. Ansgar Community School District of St. Ansgar, IA, reserves the right to reject any or all bids and waive all informality and irregularity in connection therewith if the same is judged to be in their best interests, and to make a selection, including that of any Alternate Bids, that in their judgment is best suited for the purpose intended for the project.

Bid Results

Educational

$1,164,000.00

Public - City

Renovation

40

23

22

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
65
Bidding Soon
511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 27, 2025

Project location map

To Be Determined, Saint Ansgar, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.